Title Page

  • Project name.

  • Conducted on

  • Prepared by

  • Location
  • Personnel on site.

Site address.

  • Project name / building name.

Edge protection

  • Is there edge protection in place?

Fire safety on site

  • What fire fighting equipment do you have?

Operatives

  • Names of operatives on site.

  • Do all operatives on site understand the emergency procedures?

Sign off sheet

  • 1 hour fire watch carried out?

  • Person signing start of hot works

  • Person signing off hot works after fire watch.

Photos of Thermal camera

  • Thermal at end of day.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.