Information
-
Site conducted
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Grid Line
Work Inspected
-
Do panel sections align as per drawings?
-
Have the panels been installed with the correct bracket to the beam/ column and using the correct fixings?
-
Are the panels neatly fit, plum and level into the brackets as required?
-
Are the panels of the right sizes and types being built where required?
-
Has silicone been applied to the bottom and top bracket pin slots on the panel?
-
Have lifting eyes holes and crossbeam end panel hopes been filled with GRC UK supplied compound?
-
Are all holo bolts and fixings to concrete used as per specification ?
-
Have cavity barriers been installed correctly?
-
Signature for DWS
-
Signature for Client
-
Is the finish/work acceptable?