Information

  • Audit Title

  • Client / Site

  • Prepared by

  • Location
  • Conducted on

Project Details

  • Principal Contractor

  • Architect / Designer

  • Principal Designer

  • Client

  • Number of personnel on site at time of visit

  • Number of Sub - Contractors on site at time of visit

  • Overview of works

Previous Audit

  • Has the previous site safety audit been closed out?

Health & Safety Documentation Management

  • Statutory notices displayed?

  • Although some statutory notices were on display, noted some items missing, including;

  • No statutory notices on display at time of visit. Ensure all statutory notices are displayed immediately including, policies, insurances, H&S law poster and emergency procedures etc.

  • Is there an up to date induction file available?

  • undefined

  • Review of induction folder completed and noted induction folder not being maintained as required. Ensure all persons on site receive an induction prior to commencing work on site.

  • Copies of operatives plant cards, CSR/CSCS or other training related certs?

  • undefined

  • Review of CSCS / CSR details and noted details are not being recorded as required. Ensure all operatives on site submit details of their CSCS / CSR training prior to commencing works on site.

  • Is there an accident book or incident/accident report form in site office?

  • undefined

  • No availability of an accident book on site at time of my visit. Ensure a data protection compliant accident book is available from within site office.

  • Is there a Construction Phase Health and Safety Plan available on site?

  • undefined

  • No record of a current Construction Phase Plan on site at time of visit. As per CDM regulations, ensure a Construction Phase Plan is always available for reference at all times.

  • Permit to Work system in place and all documentation complete and up to date?

  • Suitable and sufficient risk assessments available on site?

  • Evidence of RAMS communication to work force?

  • COSHH assessments available?

  • undefined

  • Unable to view records of COSHH assessments at time of visit. Ensure COSHH assessments are available from site files at all times.

  • Evidence of regular toolbox talks?

  • Site secured from risk of unauthorised access?

  • Up to date traffic management plan available?

  • Further comments

1. Working at Heights- roof work etc

  • Are holes and openings securely guard railed, provided with an equivalent standard of protection or provided with fixed, clearly marked covers to prevent falls?

  • Is edge protection suitable & sufficient?

  • Are harnesses/fall arrest systems required/available/ in use?

  • Suitable access to work areas provided for?

2. Mobile Plant/Machinery/Equipment

  • Records of regular inspection of site plant?

  • Plant/machinery/equipment in good order?

  • Plant/machinery/equipment suitable for tasks?

  • Operators trained and competent in the use of such equipment?

  • If required, evidence of Thorough Examination certification?

3. Scaffolds

  • Records of regular inspection of scaffolding?

  • Scaffold tags attached to scaffold and signed off weekly?

  • Is scaffolding erected by trained and competent personnel?

  • General condition of scaffolding observed?

  • Are loading bays provided on scaffolding?

  • If required, netting fitted to scaffolding perimeter?

4. Lifting Equipment- cranes & hoists etc

  • Is there suitable lift plan in place?

  • Was the Lift Plan developed by a competent person?

  • Is there a trained Lift Supervisor on site?

  • Loads lifted over close proximity to obstacles incl. overhead power lines?

  • Is the Lift area deemed safe i.e. restricted access? Slew area safe?

  • LOLER certification available for all items of lifting equipment?

  • Are regular, recorded LOLER equipment checks in place?

  • Are all lift operators trained and compentent?

5. Ladders/step ladders/podiums/mobile scaffold/scissor lifts WAH equipment

  • Is the ladder/step ladder/podium/mobile scaffold/scissor lifts the correct height for the job?

  • Any evidence of unusual damage, wear or corrosion?

  • If required, are hand rails fitted at edges?

  • If required, does equipment undergo regular inspection?

  • If required does the equipment have evidence of certification?

6. Hazardous Manual Tasks

  • Are mechanical aids used to minimise the need for manual handling?

  • Have operatives who regularly undertake manual handling duties received manual handling training?

7. Fire & Emergency Procedures

  • Is fire fighting equipment readily available and is the fire fighting equipment subject to regular inspection?

  • Methods in place for raising an alarm

  • Are there clear instructions on site identifying who the trained first aiders are?

  • Is the location if the first aid box clearly identified?

  • Emergency Procedures clearly displayed?

  • Fire Muster Point identified?

  • Are combustible materials and fuels stored accordingly?

  • Has an Emergency Evacuation been carried out?

8. Traffic Management

  • Are there clear measures for the separation of site traffic and pedestrians?

  • Does the site have use of allocated car parking for site users and is this clearly signposted?

9. Personal Protective Equipment (PPE)

  • Are all operatives on site wearing appropriate PPE?

  • Is all PPE used on site suitable and sufficient as per task risk assessments? Is stock available?

10. Site Welfare

  • Suitable welfare facilities provided on site?

  • Canteen in good condition – provision to heat and refrigerate food?

  • Dry rooms provided and in good condition?

11. Electrical Hazards

  • Does all electrical equipment used on site undergo PAT testing?

  • Noted a number of power tools used on site were found not to hold a current record of PAT testing. Ensure all items of power tools are regularly PAT tested with records available for inspection.

  • Items of power tools on site found to be battery operated.

  • Is electrical powered equipment 110V?

  • Is electrical equipment on site of a good condition?

  • Electrical hazards identified and control measures in place to reduce risk of contact?

  • LOTO or Isolation required and in place?

12. Environmental Hazards

  • Environmental Management plan (EMP) in place?

  • Adequate dust management system in place? Water Suppression, Local Exhaust Ventilation (LEV) etc.

  • Suitable RPE / PPE worn by work force?

  • Is there an up to date Asbestos Survey available?

13. Housekeeping

  • Are all walkways including escape routes kept free from obstruction?

  • Are all work areas adequately lit?

  • Are work areas free from trip hazards?

  • Is there a separate storage area for flammable materials?

  • Suitable and safe access to work areas?

  • Pedestrian areas / public access areas kept secure & clear from materials/equipment?

14. Excavations

  • Have all underground services been located and identified?

  • Is there adequate working space available for plant and spoil heaps?

  • Are barriers in place to protect edges?

  • Excavation edges adequately supported? Shoring, Battering, Trench Box Support etc.

15. Temporary Works

  • Has a Temporary Works Co-Ordinator been appointed? If 'Yes', please record their name

  • Is there a Temporary Works Register in place / up to date?

  • Are the Temporary Works design certificates in place as required?

  • Are associated design risk assessments in place?

Sign Off

  • On site representative

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.