Title Page
-
Site Inspection Conducted
-
Audit Date and Time
-
Auditor Name
-
Number of Staff on Site during Insection
-
Activities being undertaken on site
-
Tick if Shield are Acting as Principle Contractor?
-
Tick if Contractors are Working on Behalf of Shield
Asbestos Sites Only - Completed AR025 Full Asbestos Audit
-
1.1 Is the Asbestos Licence clearly Displayed?
-
1.2 Is Liability Insurance Clearly Displayed?
-
1.3 Is the company Waste Carrier Licence Clearly Displayed and in-date?
-
1.4 The auditor is to completed AR025 Full Asbestos Audit for Asbestos works
Fire Safety
-
2.1 Are all Shield Workers Aware How to Raise the Alarm in The Event of an Emergency?
-
2.2 Are all workforce aware of the fire evacuation procedure and muster point (as part of the induction)?
-
2.3 Are fire exits / routes free and clear of obstructions?
-
2.4 Fire Evacuation point is in a safe location and easily visible?
-
2.5 Are fire exits easy to operate and not clear / unobstructed?
-
2.6 Are all obvious ignition sources managed?
-
2.7 Are sufficient Fire Extinguishers in place (on hooks or stands)?
-
2.8 Have the Fire Extinguishers been tested within the previous 12 months?
-
2.9 Is the designated smoking area signed, and contain a suitable receptical for extinguisher smoking paraphinalia?
-
2.10 Have all Shield staff, visitors and contractors signed in?
-
2.11 Is a competent and trained fire warden on site (minimum of 1 person at any time)?
First Aid
-
3.1 Are suitable numbers of first aiders appointed and on site (minimum 1 person at any time)?
-
3.2 Are first aid boxes suitable and correctly stocked?
-
3.3 When does the First Aid Kit Expire?
-
3.4 Are the Workforce Aware Who The First aiders are and how to contact?
COSHH
-
4.1 Are hazardous substances used on site stored safely, securely sealed and with the correct approved label?
-
4.2 Are COSHH Assessments (dated within the previous 12 months) and MSDS Sheets available for all substances being used?
-
4.3 Do Users Understand the Relevant Control Measures (ventilation, PPE and First Aid Measures) ?
-
4.4 In the event of an emergency, are spill kits / clean up materials available?
Asbestos Management
-
5.1 Is an asbestos survey available?
-
5.2 If Asbestos is present, are all staff aware of the location and current control measures?
-
5.3 Are all risks from asbestos controlled?
-
5.4 Have all Shield Operatives/Supervisors undergone Asbestos Awareness Training within the previous 12 months?
Personal Protective Equipment
-
6.1 Is the correct minimum PPE being worn by all persons on site?
-
6.2 Is the PPE is good condition and with the correct Shield / Client logo?
-
6.3 Is PPE being worn as per the risk assessment for task specific activities?
-
6.4 Are Client PPE Requirements Being Adhered to?
Welfare Facilities
-
7.1 is suitable drinking water available and drinking vessels/fountain?
-
7.2 Are Suitable WC facilities available (separate for different sexes / single room)?
-
7.3 Suitable facilities for the workforce on site (size, somewhere to eat and prepare food and drink)?
-
7.4 Sufficient space in site office (if provided), not overcrowded?
-
7.5 If food suitably stored at night to prevent rodents?
-
7.6 Are WC facilities located near by?
-
7.7 Do WC facilities have suitable levels of hand soap, hot running water and a method of drying hands?
-
7.8 Are lighting levels suitable in all areas on site?
Waste Management
-
8.1 Is waste segregated and managed on site?
-
8.2 If required is Shield's waste carrier licence available?
-
8.3 Are all external waste bins / skips secured and not accessible to the general public, other contractors?
Housekeeping
-
9.1 General housekeeping to a good standard?
-
9.2 Are toilets and kitchen facilities suitably cleaned and well presented?
Manual Handling
-
10.1 Are manual handling activities managed?
-
10.2 Are mechanical aids, such as trollies and lifters available on site to reduce manual handling risks?
-
10.3 Are workers trained in correct manual handling techniques?
-
10.4 Have good manual handling techniques been observed?
Plant Equipment and Vibration
-
11.1 Are the correct tools being used (as recorded in the risk assessment)?
-
11.2 Are tools/Equipment/Plant identified within the risk assessed being used?
-
11.3 Are all tools and equipment in a good serviceable condition?
-
11.4 Is damaged equipment taken out of service and segregated to prevent use?
-
11.5 Are all workers trained to use the tools and equipment?
-
11.6 Are Operatives trained to use the equipment being used (Evidence to be observed)?
-
11.7. Does the Risk Assessment identify Planned HAVS Exposures?
Environmental Management
-
12.1 Are all obvious Environmental risks managed?
-
12.2 Is Noise at a acceptable level (being able to talk at 2mts apart without having to raise voices)?
-
12.3 Is there any evidence on spillages?
-
12.4 Is there adequate lighting to undertake the works safely?
Hot Works
-
13.1 Are Hot Works being undertaken?
-
13.2 Is a Hot Works permit in place and being followed?
-
13.3 Are the controls on the hot works permit being implemented?
-
13.4 Is there any immediate risk of fire?
-
13.5 Is the 1 hour Fire Watch being observed?
-
13.6 Are the surrounding areas free from flammable materials and substances?
Principle Contractor (PC)
-
14.1 Are contractor RAMS/POW Available on site and signed by all relevant parties?
-
14.2 Is Shield Liability Insurance Certificate displayed?
-
14.3 Is The Health & Safety Law Poster displayed?
-
14.4 If PC, Are the First Aid and Fire Warden details communicated to the workforce?
-
14.5 (Asbestos Only) Is the Asbestos Licence clearly Displayed?
-
14.6 If Principle Contractor (PC) is the Construction Phase Plan available on site?
-
14.7 Have all visitors/sub-contractors been inducted onto site?
-
14.8 Are workers and visitors signing in and out of site?
-
14.9 Is the site secure to prevent Trespassers?
Behaviour
-
15.1 Are the Workforce aware of the previous months Safety First and Tool Box Talk Subjects?
-
15.2 Are the workforce following positive safe working practices?
Documentation
-
16.1 Are signed RAMS/POW Available on site?
-
16.2 Is the Risk Assessment and Method Statements signed by all those following the RAMS?
-
16.3 Have the workforce been briefed on the Contents of the RAMS?
-
16.4 Do the RAMS identify all Risks Identified on Site?
-
16.5 Is the Shield Liability Insurance Certificate Available?
Electrical Isolation
-
17.1 Are all Electrical Isolations locked off securely to prevent unauthorised reenergisation?
-
17.2 Where Electrical isolations have been completed by those in control of the property, is a Isolation certificate available?
Sign Off
-
Contract Manager Name
-
Date and Time
-
Auditor Name and Signature
-
Date and Time
-
Where Applicable Date of Next Review
-
Comments