Introduction
-
Site name
-
Fusion area code
-
Date & Time
-
Name of Project Leader
-
Does the Project Leader hold a SSSTS certificate, equivalent or higher grade qualification?
-
What is the nature of the work?
- Pre-start site inspection
- DBA walkover survey
- Fieldwalking
- Geophysical survey
- Metal detecting survey
- Topographic survey
- Historic hedgerow survey
- Borehole sampling
- Trial trench excavation
- Strip/map and sample
- Detailed excavation
- Watching brief
- Building recording
Site documentation
-
Is the HS2 approved Project Plan and Location-specific Written Scheme of Investigation (LSWSI) available on site?
-
Is the Fusion approved & signed site-specific Risk Assessment & Methods Statement (RAMS) available on site?
-
Are these documents correct and up to date?
-
Do you have a valid permit to work?
- Permit to Dig
- Permit to Clear
- Permit to Pump
- Permit to Work near water
- Other permit
- No permit
-
Do you need a new permit before you can start work?
-
Permit numbers
-
Authorised by
-
Date issued
-
Does the site file contain the Statement of Intent, H&S Policy, Sustainability Policy, Environmental Policy, Environmental Management Plan and a copy of the Waste Carriers License?
-
Is the Health & Safety at Work poster displayed in your welfare facility alongside our current insurances?
-
Is the Accident & Emergency information clearly displayed alongside the route to the nearest casualty department?
Site inspections and H&S monitoring
-
Have you had a recent site inspection by a Project Manager, H&S Compliance Officer or Fusion team member?
-
Inspected by
-
Date inspected
-
Were there specific actions required as a result of the inspection?
-
Have all these items been resolved?
Today's safety checklist
Before starting work
-
Has everyone on site been been through the Fusion induction, including civils? (this will mean they have already presented CSCS, CPCS, Safety Critical Medicals etc.)
-
Are all staff, including civils, familiar with the RAMS and the LSWSI? (If not you must provide a briefing)
-
If you have presented a toolbox talk or morning briefing, please note the topics raised:
-
Are all staff, including civils, wearing the correct PPE for the weather conditions and the tasks that they will be undertaking today?
Welfare
-
What is the nature of the welfare provided?
-
Is the welfare adequate for the number of people on site?
-
Is the welfare facility clean, tidy and free of clutter?
-
Is the welfare facility adequately stocked with consumables? (paper towels, toilet roll etc.)
-
Is the first aid box easily accessible, fully stocked and in date? and is there a qualified first aider on site?
-
Is there a fire extinguisher located in each site vehicle and welfare facility?
-
Please report any issues, damage or occurrences that have come to your attention
-
Please provide images
Plant
-
Is there plant operating on site today?
-
Is there any sign of leakage since the plant was last in use?
-
Does each piece of plant have an on board spill kit, and is there a spill kit by the refuel point?
-
Has each operator performed routine daily maintenance checks? (this should be recorded in a log book or similar)
-
Have any plant defects been noted?
-
Please note any items raised by your civils contract staff that requires further attention
-
Please provide images
Vehicles
-
Vehicle make/model & registration (primary vehicle)
-
Vehicle make/model & registration (secondary vehicle)
-
Have you noted any vehicle defects during your daily inspection?
-
Have any of the following items failed their daily inspection? (tick any that apply)
- No defects noted
- Front lights
- Rear lights
- Reversing light
- Indicators
- Tyre wear
- Tyre pressure (this week)
- Spare wheel
- Mirrors
- Horn
- Foot brake
- Hand brake
- Windscreen
- Rear window
- Wipers
- Screenwash
- Oil
- Coolant
- Engine clear of debris
-
Please give further details of any defects/damage, noting which vehicle, circumstances and any third party details
-
Please provide an image of any defects/damage
Site
-
What are the weather conditions?
-
Is there a risk of dust today? (consider weather conditions and vehicle movements)
-
Is there suitable edge protection where required? (all trenches and spoil heaps must be fenced with metal barriers)
-
Is there a designated safe point for the use of mobile phones?
-
Are the work areas clean, tidy and free of clutter?
-
Do you have any concerns over the behavioral safety of the staff?
-
Have there been any significant changes on site since your last daily report?
-
Have you informed all staff of these changes?
-
Does the RAMS need to be updated? (annotate the old RAMS in pen until an updated copy can be issued)
Ecology
-
Is there any sign of activity by protected species or otherwise in any of the work areas? (the occurrence of wildlife on site must be reported immediately, do not disturb)
-
Do you require the advice/attendance of an ecologist?
Access & Egress
-
Is appropriate Traffic Control in place when crossing or using public rights of way and the public highway? (this must conform to your Schedule 4 notice)
-
Is the Construction Logistics Plan (CLP) accurate and up to date? (this should be included as an appendix to the RAMS)
-
Have all public rights of way been fenced off where needed, and appropriate signs erected?
-
Are designated pedestrian and vehicle routes clearly separated and guarded at pinch points and within enclosed areas? (i.e. parking areas, storage areas, refueling points etc.)
-
Are walkways, bridges, ladders and ramps in safe, secured positions?
-
Have all slip/trip hazards been minimized wherever possible?
-
Are there safe means of egress regularly spaced across the work areas?
-
Are all personnel familiar with emergency, rescue and evacuation procedures?
Archaeological quality control (at least once/week)
-
Does the work on site conform to the Project Plan & LSWSI?
-
Which items require review?
- Not required
- Aims & objectives
- Method of excavation/recording
- Excavation sampling strategy
- Environmental sampling strategy
- Site plans
- Survey plans
- Specialist methodologies
-
If the work does not conform, please give further details
-
Do any of the site records raise concern in view of either the CIfA Code of Conduct or the agreed Project Plan & LSWSI?
-
Which items need improving?
- All records are satisfactory
- Digital planning/survey
- Hand drawn plans
- Hand drawn sections
- Calculation of levels
- Application of registered finds
- Context register is accurate
- Context sheets are accurate
- Samples/finds selection
- Samples/finds correctly labelled
- Finds prepped for transport
- Photographic quality
- Images of feature groups
- Photographic registers
- Progress photographs
-
Please raise any specific issues here
-
Please provide images
-
Have you had a recent inspection by a Project Manager?
-
Inspected by
-
Date inspected
-
Were there specific actions required as a result of this inspection?
-
Have these items been resolved?
Progress & resourcing
-
Estimate your progress to completion overall as a percentage (this is just a rough guide)
-
Quantify the extent of work completed to date (i.e. number of trenches open/closed, area of geophysical survey complete, portion of the detailed excavation or SMS complete etc.)
-
What is the nature of the archaeology you investigated today? (briefly characterize; indicate thickness/depth, density, extent, probable date, potential significance)
-
Please provide images
-
Have any contingency items been triggered as the result of unexpected discoveries? (you should not proceed with these until instructed to do so)
-
Please provide images
-
How well is the work progressing?
-
What is your target for the end of the week?
-
Do you require more resources?
-
Roughly how many person days do you think you will need to meet your target this week? (if you are unsure, say so)
Today's expenditure (excluding welfare, fencing etc.)
-
MOLA Project Manager on site (nearest quarter day)
-
MOLA Project Officer/Assistant Manager on site (nearest quarter day)
-
MOLA Supervisors on site (nearest half day)
-
MOLA Archaeologists on site (whole days only)
-
Note any other staff visits from MOLA specialists (i.e. Geomatics, Geoarchaeologists etc.)
-
RPS service locator on site (whole days only)
-
UXO specialist one site (whole days only)
-
Ecologists on site (nearest quarter day)
-
Civils site manager on site (nearest quarter day)
-
Civils plant operators on site (whole days only)
-
Civils general operatives on site (whole days only)
-
How many of MOLA fleet vehicles are on site?
-
What types of vehicles are you using?
-
Did you refuel today? (Attach image of receipt)
-
How many other vehicles are on site? (machine driver, engineers etc.)
-
How many mechanical excavators are running?
-
How many dump trucks are running?
-
What is the size of the plant in use? Please note any stand down time
-
Note any additional items (water pumps etc.)
Environmental sustainability (civils to track welfare usage, deliveries & excavated material)
Waste
-
How many black bin bags of rubbish have you disposed of at base today?
-
How many used paint cans have you disposed of at base today?
Water
-
How many liters of water did you use today?
Sign Off
-
Name & signature of Project Leader