Administration / Signage
Administration
-
Is there a visitor and/or contractor sign in book
-
Are all personnel being inducted
-
Are emergency procedures in place
-
Are all workers passports being verified
-
Is Task Analysis being done for significant operations
-
Has W&H notified notifiable work
-
Are there first aiders available for all shifts
-
Are regular H&S inspections being conducted (at least monthly)
-
Has a rescue plan been implemented for working at heights
Signage
-
Adequate hazard board visible
-
Has the hazard board been updated recently
-
Is there adequate site signage
-
Emergency numbers displayed and up to date
-
Does the site signage include PC name & contact no, including after hrs no, site office location & clearly visible from outside the work place
Incident / Accident Reporting
-
Is there an incident register present & up to date
-
Is there a detailed description of what happened
-
Has the cause of the incident / accident been identified
-
Have preventative actions been described
-
If so, have the preventative actions been agreed and actioned
-
Has WorkSafe NZ been notified of serious harm incidents
TMP / Environmental / Facilities
Traffic Management Plan
-
Is there a TMP for this site
-
Is there a copy of the TMP on site
-
Is there a truck tyre wash system in place
Environmental
-
Is there an environmental protection plan in place
-
Is there a silt control plan in place
-
Are wash out areas provided for paint, plaster & concrete adequately controlled
-
Is dust controlled on site
-
Is construction waste being controlled
-
Is construction noise being controlled
Facilities
-
Toilet areas clean and tidy
-
Temporary electrical installation tagged
-
First aid kits in place and well stocked
-
Fire extinguishers charged & current - serviced 12 monthly
-
Is there an air horn or emergency signaling device on site
Sub Contractors
-
Do all Sub Contractors have approved SSSP's on site (signed by both parties)
-
Is there evidence of a pre-start meeting held with selected sub-contractors
-
Are controls in place to manage risk of falls from height as per their Task Analysis
-
Are they conducting toolbox talks on a regular basis<br>(preferably weekly)
-
Have they identified hazards & is their hazard register up to date
-
Are task analysis being done
-
Are all task analysis signed off by workers
-
Are safety controls identified in the task analysis
-
Are they working in accordance to their task analysis
-
Have they notified notifiable works
-
Do all sub contractors have training registers in place<br>(licenses to be included)
Housekeeping / PPE / Electrical
Housekeeping
-
Are work areas clean and tidy
-
Are materials stacked and stored safely
-
Are bins / skips provided
-
Adequate lighting
-
Public protection
-
Is all emergency equipment free from obstructions
-
Have nails in timber been made safe
Personal Protective Equipment
-
Hard hats worn
-
Eye protection worn
-
Breathing apparatus worn
-
Hearing protection worn
-
Hi visibility clothing worn
-
Adequate safety footwear worn
-
Fall arrest harness worn
Electrical
-
Do site sheds have current WoEF or Electrical Certificate of Compliance
-
Main switchboard door locked
-
Lifeguard units tagged and in date
-
Leads tagged and in date
-
Electrical tools tagged and in date
-
Systems in place to identify works on / near live electrical systems e.g. permit to work
-
Leads clear of water
-
Leads placed in positions to avoid tripping hazards
-
All equipment without defect<br>e.g. frayed leads, exposed wires, broken plugs
-
Are LOTO procedures being adhered to for electrical work
Scaffold / Mobile scaffold / Suspended scaffold / Ladders
Scaffolding
-
Is scaffolding being used on this site
-
Suitable for the job
-
Erected by ticketed scaffolder for above 5m
-
Scaf-tag / acu-log scaffold register up to date
-
Last check conducted
-
Access to scaffold
-
Guardrails between 0.9 & 1.1m
-
Intermediate rail in place
-
Toeboards in place & 225mm high min
-
Adequate base plates & sole plates
-
Scaffold planks made secure, not loose
-
Scaffold no more than 300mm away from the working face. If this is not practicable, inside guardrails must be installed
-
Platform wide enough to allow 450mm of clear access past stacked material or obstruction
-
Platform free of trip hazards
-
Inspections of scaffold once erection has been completed
-
Is scaffolding in the process of being erected or dismantled
-
Are harnesses, safety helmets & appropriate safety footwear being worn
-
No climbing on the outside of the scaffolding
Mobile Scaffold
-
Is mobile scaffolding being used on this site
-
Suitable for the job
-
Set up on firm ground
-
Wheels locked
-
Deck fully planked & secure
-
Guardrails between 0.9 & 1.1m
-
Toeboards in place where scaffold is over 3m high
-
Access from within the scaffold frame
-
All mobile scaffolding over 3m (from lowest deck platform) braced on all sides
-
For scaffolding over 2m high, ensure the height of the top working platform is no more than 3x the minimum base dimension
-
For scaffolding under 2m high, ensure the height of the top working platform is no more than 2x the minimum base dimension
-
Scaf-tag / acu-log in place & up to date where required
-
Last check conducted
Standard ladders
-
Are ladders being used on this site
-
Suitable for the job
-
Set up on firm ground
-
Are ladders secured - base and/or top
-
Correct angle - 4 up to 1 out
-
Styles not damaged
-
Rungs not damaged
-
Projects 1m above step off point
Step ladders
-
Are step ladders being used on this site
-
Suitable for the job
-
Step ladder lock bars in place
-
Set up on firm ground
-
Styles not damaged
-
Rungs not damaged
-
Operator not working higher than third step down
Falsework / Formwork
-
Is false / form work being used on this site
-
Do all supports have adequate brearing
-
Are all support frames / props plumb
-
Are all props tied with laterally
-
Are forkheads used for bearer support
-
Are bearers wedged centrally in forkhead
-
Are screw jacks within maximum extension allowed
-
Are all attached scaffold platforms adequately supported
-
Do attached scaffold platforms have handrails
Demolition / Excavation & Trenches
Demolition
-
Is there any demolition on this site
-
Are all control measures in place as per the task analysis
-
Is access to the demolition area restricted and secure
-
Are protection measures for general public in place
-
Temporary supports identified and in place to prevent collapse
-
All services / sources identified and isolated e.g. Gas, electricity & water
-
Is there site fencing, hoarding or other appropriate seperation
Excavation & Trenches
-
Is there any excavation on site
-
Have all underground services been located and identified prior to digging
-
Are excavations battered, benched or supported (trenches >1.5m deep)
-
Are excavations barricaded off to prevent falls (at least 1m from the edge)
-
Are materials stored more than 1m from the edge to prevent collapse
-
Are vehicles and plant at a safe distance to prevent collapse
Plant / EWP / Crane & lifting appliance
Plant & vehicles
-
Are plant & vehicles being used on site
-
Do operators have required training necessary
-
Fitted with operator protective structures TOPS / ROPS
-
Are pre-start checklists / log books being completed before use
-
Are there maintenance records available
-
Is plant / vehicles & pedestrians being kept apart
-
Are people kept away from slewing vehicles, or, if not, can you use a zero tail swing machine
-
Is a seat belt being worn when plant is in use
-
Are reversing alarms active
-
Are LOTO tags being used (lock-out tag-out) during maintaining, servicing, cleaning plant, etc. on site
Elevated Work Platform
-
Are Elevated Work Platforms being used
-
Set up on level ground
-
Are the outriggers fully extended
-
Inspected and certified within the last 6 months
-
Are daily pre-start checklists / log books being completed before use
-
At least 4m from power lines
-
Where applicable, are safety harnesses being worn as per Best Practices Guidlines
-
Harness lanyard just long enough
Cranes & Lifting equipment
-
Are Cranes and / or lifting equipment being used
-
Has the lift zone been isolated or cleared of people
-
No one under the live load
-
Is there a current test certificate
-
Are pre-start checklists / inspections being completed before use
-
Is the crane lifting equipment certified
-
Is there a lift plan and has this been communicated to all workers involved in the lifting operations
-
Are outriggers (if needed) fully extended and used on firm footings
-
Are the crane operator / dogman competant
Hazardous substances / Hot works & grinding
Hazardous Substances
-
Are hazardous substances being used
-
Is there a hazardous substance register
-
Are there SDS sheets available for all hazardous substances
-
Have all SDS been reviewed within the last 5 years
-
Are hazardous substances stored correctly e.g. bund wall, ventilation
-
Are all containers appropriately labelled
-
Are gas bottles secured in use and / or stored correctly e.g. chained against a wall, in a well ventilated area
-
Are cylinders tagged and within date of inspection
-
Hose and hose connections in good condition
Hot Works
-
Are hot works being conducted during the audit
-
Is there a hot work procedure / permit in place
-
Are the permit requirements being met
-
Are there welding screens in place
-
Have all flammables and accelerants been removed from the work area
-
Is there a fire extinguisher available at the work area
Manual Handling
-
Are mechanical aids provided and used
-
Are manual handling controls implemented in accordance with the TA's
General
-
No radios in the place of work
-
Are fall hazards controlled e.g. edge protection
-
Are stairways fitted with handrails / edge protection
-
Step up onto platform or structure not more than 300mm<br>
-
Guardrails / toeboards in place where required
-
Are propping systems braced, tied & props OK
-
Safety anchors / static lines for fall arrest
-
All vertical reinforcing steel capped
-
Slip & trip hazards controlled
-
Are all saw benches set up safely
-
Adequate weld flash protection
-
Is all equipment adequately gaurded
-
Do powder powered tools have a current certificate
-
Other safety observations
-
Do all Green Homes vehicles on site have valid WOF's & Rego's
Recommendations / Corrective actions
-
Recommendations
Sign off
-
Person conducting the audit
-
Add signature
-
Project manager / site supervisor
-
Add signature