Title Page
-
Customer Name
-
Type of Work
-
Date
-
Conducted by
-
Location
-
Number of Persons Observed
-
Instruction: any item identified as "no" or at risk requires a documented action. All Reports must be kept as evidence. Email to yourself or your administrator and save in local teamroom or designated folder. File naming convention: include type, month/yr and your name/initials.
Readiness of People
-
Changing position
-
Stopping work
-
Rearranging task or job
-
Hiding or dodging
-
Changing tools
-
Applying Lockout Tagout
-
Adjusting PPE
Position of People
-
Striking against
-
Caught in-between
-
Heat or Cold Stress
-
Inhaling (chemical, dust, etc.)
-
Absorbing (chemical)
-
Electrical
-
Hazardous energy
-
Falling different level
-
Slip, trip, fall same level
-
Struck by
-
Vehicle or moving equipment
-
Other:
PPE personal protective equipment right for task and properly fitted, inspected and used
-
Head
-
Eyes
-
Face (face-shield used with safety glasses)
-
Ears (muffs, foam or custom ear plugs)
-
Respiratory system (seal, dust mask, half- or full face respirator, cartridge type -duration of use, all bands in place, clean shaven)
-
Hands and arms (glove type, size, cut-proof sleeves, no jewelry, sleeves)
-
Feet and legs (boot or shoe type, pants)
-
Other PPE:
Tools and/or Equipment
-
Right for the task or job
-
Used correctly
-
In safe good condition
-
Harness, SRL etc. Inspected & in good condition
-
Gloves right for task
-
Ladders, platforms, Barricades, railings in good condition & right for task
-
Warning (signs, alarms, etc.) in place & functional
-
Pre-job inspections completed & deviations corrected
-
Monitoring and/or measuring equipment in good condition & calibrated
-
Other:
Procedures
-
Has a complete, timely and accurate risk assessment has been completed for all their work tasks and updated when any changes occurred?
-
Does the risk assessment identify all hazards, risk rating and controls and are the controls fully implemented?
-
Has the supervisor been contacted to discuss how to effectively mitigate any residual risks (risk after implementation of control) with a medium or high rating, and have these controls been fully implemented?
-
Standard right for task or job
-
Standard readily available
-
Standard up-to-date
-
Permit to work in place, current, and complete
-
Fire watch in place
-
Gas testing completed documnted
-
Zero energy state verified
-
Emergency rescue in place
-
Other:
5S Orderliness & Tidyness
-
Standard in place & understood
-
Work area organized
-
Well-organized tools
-
Material storage right (hazmat 2-dary containment, shelving, etc.)
-
Stairs/platforms location (controlled access if in pathway)
-
Obstructions (adequate egress/ entrance)
Behaviour Observation Team Member(s)
-
Name and signature
-
Name and signature
-
Name and signature
-
Name and signature