Title Page

  • Conducted on:

  • Prepared by

  • Location

Audit Start

  • Did you have a site induction

  • Was Health and Safety and Environmental Issues discussed

  • Who attended the induction

Sheet1

  • Site Inspection & Competency Audit

  • Auditee Name:

  • Job:

  • Date:

Section 1:

PPE & Safety Equipment Used

  • Tools in Use

  • Are they doing an electrical job

  • Electrical PPE in Use

  • Insulated electrical tools & Volt Stick

  • Respiratory PPE

  • What type show me

  • RCD Circuit breaker

  • What type show me

  • Shrouding & matting

  • Socket Loop tester

  • Electrical work in progress signs

  • Volt/Multi meter c/w GS38 test leads

  • Hot works sleeves / gauntlets

  • Proving unit

  • Means of raising alarm

  • What are they

  • In date PAT test on electrical equip

  • What is the date of test

  • Relevant Permits to work Take a picture if Permits are present

  • Were the permits filled in correctly and with the Job

  • Locking off kit

  • Barriers in place

  • Capacitor discharge tool

  • Take a picture

  • Working at height PPE

  • What was the PPE being worn Take picture but ask first.

  • GRP Ladders/Steps/Hopup

  • Fall arrest harnesses checked if in use

  • Was It Deemed ok to use

  • What do you do if its Failed

  • Scaffold tower and scafftag

  • Was it in date

  • Fire extinguisher available

  • Are they in date

  • Brazing equipment

  • Do you need a hot work permit for brazing on this site

  • SSOW/RAMS available for activities

  • Pressure testing equipment

  • Is it in calibration

Section 2:

Training

  • Refrigeration C&G/NVQ

  • General appearance, engineer and vehicle

  • Electrical C&G/NVQ

  • Sign in Log on arrival

  • Take photo of sign in sheet.

  • Other Electrical Competency Training

  • Have they seen the AFE Electrical Handbook

  • Can they Fault diagnosed/repaired in a timely manner

  • Do engineers on site have FGas C&G

  • Operational test carried out

  • CSCS Card Take a picture if card is present

  • Do they complete a Job sheet completed

  • Take a picture of it

  • PASMA Card Take a picture if card is present

  • Take a picture

  • IPAF Card If Required

  • Take a picture of card front and back.

  • Work area left clean and tidy

  • Online training uptodate

  • Power Isolated LOTO and Proved Dead

  • Take Picture of LOTO Devises in use

  • Technical information available

  • RCD present

  • Take picture

  • Driver profile & licence check in the last six months

  • Earth Bonded

  • satisfactory ECT and IRT tests

  • Other?

  • Toolbox talks given

  • Photographic evidence taken

Section 3: Description of task being done

  • Risk Assessment, Method Statement & COSHH assessments seen

  • Has the Rams pack been signed off by all working on jobs it covers

Section 4: Corrective and preventative actions

  • What where the Points to raise as concerns in this Audit

Section 5: Sign off of Audit

  • Auditor

  • Auditors Signature

  • Date of Completion

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.