General
-
Has a Pre-Start Briefing been conducted with workers and are workers aware of the specific hazards/risks to the specific work activity and tasks to be undertaken?
-
All workers on site have Construction induction (white / blue) cards?
-
All workers on site have been inducted?
-
Delivery drivers have completed a Delivery Driver Induction?
-
SWMS are signed off by relevant workers performing high risk work?
-
Are the specific controls implemented in accordance with the SWMS requirements?
-
Construction signage is present showing: the principal contractor’s name, contact numbers including after hours number and the location of the site office? The signage is visible from outside the work area?
-
Access and egress to work area is clear and free from trip hazards?
-
Housekeeping is good - no tools, equipment, rubbish etc. in walkways?
-
Walkways are clearly demarcated and pedestrians are separated from mobile plant and other hazards?
-
Other issues identified? See notes...
Plant
-
All operational plant on site has a registered Plant Approved sticker?
-
Pre-start checklist completed?
-
Operators have been deemed competent or are suitably supervised?
-
Is the plant correctly parked? (Eg. attachments, blades lowered, not idling unattended)
-
Is the plant free from damage and in good condition? (No missing or damaged guards, no obvious leaks, tyres ok etc.)
-
Has a plant risk assessment been performed and is it available?
Scaffolding
-
Scaffolding has been erected by appropriately licensed workers?
-
Scaf tags have been completed for each scaffold structure within 30 days by a competent person?
-
Safe access to and egress from scaffold has been provided during erection, use and dismantling?
Formwork
-
Levelled base plates / sole boards are provided under props and standards? No wash outs or uneven bedding?
-
Edge protection is provided where required?
-
Ladders used for access are appropriately secured?
-
Perimeter containment screening is installed with no gaps of more than 25mm?
-
Reo bars are adequately capped or do not present a risk of injury?
Cranes and Lifting Operations
-
Crane operators have relevant high risk work licenses - C2 (up to 20t), C6 (up to 60t), C1 (up to 100t), C0 (over 100t)
-
Vehicle Loading Crane (capacity of 10 metre tonnes or more) operators have Vehicle Loading Crane HRW license or C2, C6, C1 or C0? <br>Metre tonne = Lift Capacity x Radius
-
Crane operators, doggers, riggers have been verified as competent?
-
Lift Plans are in place for all major lifts (Heavy lifts >50t, Bridge beams, Multiple crane lifts, Workbox lifting persons, Vicinity of power lines, On or above water, Unusual or odd shaped items) and the lift plan is included in the SWMS?
-
Workers involved have been trained in the Lift Plan?
-
Lifting equipment has been inspected daily by operators prior to use?
-
Lifting equipment has been inspected quarterly by a competent person (eg. dogger, rigger) with test tags attached?
Electrical
-
Electrical work is only performed by a qualified electrician?
-
Work conducted near electrical power lines is done so under an Electrical Vicinity Permit, where required?
-
Construction power is protected by an RCD?
-
Electrical equipment is tested and tagged by a competent person within the required period?
Excavations and Trenching
-
All excavations or penetrations have an authorised excavation permit completed prior to commencement of excavation work?
-
Benching, battering or shoring has been used to control the risk of ground collapse in excavations deeper than 1.5m?
-
Adequate controls are in place to prevent falls into excavations and falling objects?
Working on or Near the Road Corridor
-
All relevant workers have signed on to a SWMS for this work?
-
Traffic control is in place where required?
-
Do all workers with responsibility for traffic control, hold the relevant training and qualifications?
-
Traffic controllers have access to the current approved TGS?
-
The traffic management set up is compliant to the approved TGS?
-
Does the TC have an adequate escape route?
-
Are emergency contact numbers posted where temporary traffic controls operations will remain in place after-hours?
Working at Heights
-
Permit is in place for Work at Heights?
-
All relevant workers are trained and VOC is reasonably available?
-
Harnesses and other WaH equipment is checked, tagged and in date?
-
Anchorage is suitable, 100% hook up is used?
Other Permits to Work
-
Permits are in place for Concrete Cutting and Drilling?
-
Permits are in place for Hot Works?
-
Permits are in place for Work in QR Rail Corridor?
-
Permit is in place for working near live electrical equipment?
Amenities
-
Are toilets and hand washing facilities available on site or within a reasonable distance? (Eg. a short drive & vehicle available)
-
Is drinking water available?
-
Are suitable facilities available for meal breaks?
First Aid
-
Are there sufficient 1st aid kits available?
-
Is there qualified First Aid personnel on site?
PPE
-
Is PPE worn by workers compliant to site requirements?
Hazardous Substances
-
Have all hazardous substances been identified?
-
Are all hazardous substances correctly stored?
-
Are containers clearly marked / labelled correctly?
-
Is there appropriate ventilation for use and storage?
-
Are Safety Data Sheets (SDS) available to workers and in date?
-
Is a spill kit available?