Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Site Name:
-
Completed by:
-
Weather Conditions:
- Sunny
- Fair
- Wet
- Snow
- Dry/Sunny
- Cold
-
Position:
-
Date and Time of Checklist
Fire:
-
1. Fire escape doors, corridors clear of obstructions, operating effectively and well lit.
-
2. Fire doors in good condition and closed.
-
3. Fire extinguishers provided where necessary and maintained
-
4. Clear access to extinguishers, dry risers, call points and alarm panels.
-
5. Combustibles stored away from buildings - not accumulating in voids.
-
6. No electrical hazards.
-
7. Fire alarms checked weekly and any remedial work completed.
-
8. Emergency lighting checked and functioning.
-
9. Fire panel free from faults.
-
10. Fire log available, maintenance records up to date and remedial works completed.
-
Comments:
-
Completed:
Slips, trips and falls:
-
11. Accessible areas well lit, free from damage.
-
12. Surfaces free from holes, spillages and other slip/trip hazards.
-
13. Entrance mats provided and maintained.
-
14. All stairs checked - nosings intact, secure handrail, minimal debris.
-
15. Permanent obstructions at head height or below knee level highlighted/padded.
-
16. Gritting arrangements are in place between Oct & Apr.
-
17. Drain covers intact and in good condition.
-
18. First aid kits provided and fully stocked.
-
Comments:
-
Select date
Building fabric:
-
19. No loose tiles, damaged brick work, loose cladding, structural fire damage.
-
20. Staircases, fixed ladders and fire escapes free from damage.
-
21. Boundary fencing in sound condition no damage.
-
22. Glazing/windows free from damaged/broken glass.
-
Comments:
-
Select date
General Housekeeping and Security:
-
23. Lighting in accessible areas operating.
-
24. No storage/stacking that could collapse or materials that could fall.
-
25. Absence of overgrown trees, shrubs or fallen leaves, moss on paths.
-
26. Surfaces free of excessive bird droppings.
-
27. No obvious rat or bird activity in void areas.
-
28. Internal routes free from accumulated debris.
-
29. Refuse areas clean and tidy - storage is away from the building.
-
30. Void areas are secure I.e locked and properly boarded up.
-
31. Signage in place I.e fire, crossings, speed limits, asbestos roofs etc.
-
32. Signposts, flag poles and bolted fixings properly secured.
-
33. No loose or unsecured posts.
-
34. Visitors log being completed and identification badges are being issued.
-
35. Welfare facilities in good condition. I.e toilets, drinking water, changing facilities, workstations etc.
-
36. Keys removed from compactors when not in use.
-
37. Edge protection/life belts around deep water provided and maintained.
-
Comments:
-
Select date
Car park and service areas:
-
38. Car parks and service areas free of potholes, obstructions, spillages and debris.
-
39. Areas well lit, no blown bulbs.
-
40. Fire doors and exit routes free of obstruction.
-
41. Drainage covers intact.
-
42. Speed limit signs in place and speed humps clearly identified.
-
43. Traffic routes free from obstructions to drivers vision.
-
44. Barriers and gates checked and are secure.
-
45. Traffic markings/parking bays clear.
-
Comments:
-
Select date
Roofs and falls from height:
-
46. Roof/tower/tank access and fixed ladders kept locked/secured.
-
47. Key control system working effectively.
-
48. Free from slip/trip hazards and general debris/litter.
-
49. Edge protection checked, in sound condition.
-
50. Cradles/lifting gear secured to prevent unauthorised use and covered to minimise weather damage.
-
51. No unguarded drops.
-
52. Ladders maintained and secured to prevent unauthorised use.
-
Comments:
-
Select date
Plant rooms and workshops:
-
53. Plant rooms, riser cupboards and workshops locked when not in use.
-
54. Ventilation and lighting provided and working.
-
55. Work equipment and materials stored safely.
-
56. Rubber mats provided in front of control panels.
-
57. Water tanks, sumps, pits etc are covered.
-
58. Noise control areas identified and ear protection provided.
-
Comments:
-
Select date
Maintenance and contractors:
-
59. Contractors/maintenance working in a segregated area.
-
60. Safety documentation provided and accurate I.e permissions, permits.
-
61. Machinery guards are in place I.e lifting gear, belts, fans etc.
-
62. Current thorough examination reports for lifting equipment available and remedial actions completed
-
63. Lift cards are being completed at the correct intervals and there are no recurring issues.
-
64. Lift telephones/remote monitoring systems are operating effectively.
-
65. Water log available, maintenance and monitoring records up to date and remedial actions completed.
-
Comments:
-
Select date
Children's play areas:
-
66. Equipment, surfaces etc clean and free form damage, spillages etc.
-
Comments:
-
Select date
Asbestos risk monitoring:
-
67. The asbestos containing materials marked and in good condition.
Accidents:
-
68. Any accidents have been recorded, investigated and reported to the H&S team.
Previous checklists:
-
69. Last months checklists were completed and the actions closed.
-
Signature:
-
Operations Manager
-
Select date