Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Personnel

1.0 Previous inspection

  • 1.1 Has the last inspection been reviewed

  • 1.2 Have all outstanding actions been closed out

2.0 Audit findings

  • 2.1 Project register

  • 2.2 Consultant / Subcontractor engagement documents

  • 2.3 Purchase orders

  • 2.4 Inspection and test plans (F08)

  • 2.5 QA Checklists

  • 2.6 System deficiency notices on subcontractors / Consultants

  • 2.7 Consultant and subcontractor payment claims annotated for payment

  • 2.8 Signed delivery dockets

  • 2.9 Hazardous Substance register

  • 2.10 IMTE register (F11) and subcontractors schedules <br>

  • 2.11 Register of variations and Project changers

  • 2.12 Safety / Environmental incident reports (F12)

  • 2.13 Site inductions (F20)

  • 2.14 Safe Work method Statements

  • 2.15 Plant checklist and maintenance records

  • 2.16 Site Management and Toolbox talks (F32) - content and frequency

Sign off

  • Auditor

  • On site representative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.