Information
-
Client / Site
-
Huston Electric Foreman
-
Conducted on
-
General Contractor / Construction Manager/ Huston Prime
-
Audit Prepared By
-
Location
-
Number of Huston Electric employees on site
Huston Tech, Sign, Solar, Generator Onsite
-
-
undefined
PROGRAM ADMINISTRATION
-
1.1 OSHA POSTINGS
-
1.2 Emergency numbers / contacts posted
-
1.3 Safety/ SDS manual - Huston Electric
-
1.5 Weekly toolbox talks completed
-
1.6 Weekly toolbox talks sign in sheets on file - Huston Electric
-
1.7 First aid kits - stocked and available to employees
-
1.8 First aid/CPR trained on site
-
1.10 Fire extinguisher - trailer
HOUSEKEEPING
-
2.1 Work areas orderly and material properly stored
-
2.2 Clear access to building and site
-
2.3 Job site free of slips, trips and fall hazards
-
2.4 Stairways / walkways clear
ELECTRICAL / UTILITY
-
3.1 Insulation intact on cords and wiring
-
3.2 Temporary lighting guarded and protected from incidental contact
-
3.3 Electrical panels labeled Energized and covered
-
3.4 GFCI protection utilized
-
3.5 Underground electrical lines and all other utilities marked
-
3.6 All electrical installations are properly secured and protected
-
3.7 Lockout procedures utilized
-
3.8 Live parts guarded, to include receptacles, panels, and conductors
-
3.9 HOT/LIVE electrical work is avoided
HAND AND POWER EQUIPMENT
-
4.2 Electrical cords in good working order
-
4.3 All mechanical safeguards in use
-
4.4 Workstations are set up to eliminate trip hazards
LIFTS AND EQUIPMENT
-
5.1 Aerial lift - training completed
-
5.2 Aerial lift - fall protection used properly
-
5.3 Aerial lift - daily inspection completed
-
5.4 Crane inspection - current annual inspection & daily inspection
-
5.5 Cranes- swing radius protected - level
FALL PROTECTION AND BARRICADES
-
6.1 Leading edges guarded and will meet all OSHA requirements
-
6.2 Floor openings planked or barricaded
-
6.3 Fall protection inspected prior to use
-
6.4 Fall protection worn properly
-
6.5 Fall protection application would keep employee from hitting the ground
EXCAVATION
-
7.1 Necessary ladders provided
-
7.2 Spoil set back at least 2 feet
-
7.3 Rebar impalement protection
-
7.4 Excavation determined not to be a confined space
LADDERS
-
8.1 Ladders in good condition
-
8.2 Side rails extend 36 inches above landing
-
8.3 Proper for job and secure
-
8.4 Step ladders fully open when in use
-
8.6 Area around ladder is free of material and debris
SCAFFOLDING
-
9.1 All scaffolds plumbed and leveled as erection proceeds
-
9.2 Are adequate sills and base plates being used
-
9.3 Are guardrails and end rails in place
-
9.6 Is their an assess ladder, steps or equivalent safe access to scaffold
PPE
-
10.1 Hard hats worn
-
10.2 Gloves worn while working
-
10.3 Face shields being used when needed
-
10.4 Eye protection utilized
-
10.5 Hearing protection utilized
-
10.7 High visible clothing in use when needed
ENVIRONMENTAL CONTROLS
-
11.1 MSDS maintained on site for all hazardous chemicals
-
11.2 Hazardous materials properly stored
FIRE PREVENTION
-
12.1 Are safety cans being used and properly labeled
-
12.3 Compressed gas cylinders secured, upright, broken down, & protected from damage
-
12.5 Fire extinguishers immediately available and inspection current
HUSTON INFO
-
Notes
-
Notes
OTHER CONTRACTOR INFO or VIOLATIONS
-
Notes
-
Notes
-
Notes
Huston & Site Score