Title Page

  • Date and Time

  • Customer Name

  • Location
  • Technician Name

Installation Checklist

Pre-Installation Check

  • Have the project specifications and requirements been reviewed?

  • Was a site visit performed to assess the installation location?

  • Is the installation location suitable for the HVAC unit?

  • Was the appropriate HVAC unit size and capacity determined based on load calculations?

  • Are the necessary permits and approvals for the installation obtained?

  • Is the unit inspected for shipping damage?

  • Does the model number match the order?

  • Is there a new filter in place?

  • Information about the filter

Installation Checklist

Indoor Unit Checklist

  • Is an indoor HVAC unit being installed?

  • Type of indoor unit installed

  • Photo of air handler/furnace

  • Photo of air handler/furnace model & serial number

  • Was the ductwork adequately secured with screws and metal tape?

  • Are all wires neatly secured with wire ties?

  • Was an electric heater package installed?

  • Picture of the electric heater amperage on meter

  • Is a condensate drain trap required?

  • Does the indoor unit have an EZ Trap installed?

  • Is the condensate drain line secured with PVC glue?

  • Filter size

  • Was the new filter installed?

  • Was the indoor unit wiped down?

  • Were the trash and debris cleaned up?

  • Additional notes

  • Additional photo(s)

  • No action needed. Proceed with other items.

Outdoor Unit Checklist

  • Is an outdoor HVAC unit being installed?

  • Type of outdoor unit

  • Brand of condenser

  • Photo of outdoor unit

  • Photo of condenser model & serial number

  • Was the service disconnect replaced?

  • Was the electrical whip replaced?

  • What is the outdoor unit amperage draw?

  • Photo of meter

  • Type of refrigerant

  • Outdoor temperature

  • Indoor wet bulb temperature

  • Indoor dry bulb temperature

  • What is the charging requirement?

  • Required superheat

  • Actual superheat

  • Required subcool

  • Actual subcool

  • Photo of system pressures

  • Are all wires neatly secured with wire ties?

  • Is the outdoor unit wiped down?

  • Are the trash and particles cleaned up?

  • Additional notes

  • Additional photo(s)

  • No action needed. Proceed with other items.

Thermostat Checklist

  • Is a thermostat being installed?

  • Brand of thermostat installed

  • Photo of thermostat

  • Was the unit in each thermostat mode checked?

  • What is the final thermostat temperature and mode?

  • Additional notes

  • Additional photo(s)

  • No action needed. Proceed with other items.

Customer Communication Checklist

  • Did the technician allow the customer to see the unit in operation?

  • Have the technician conducted a final walkthrough with the client to demonstrate system operation and address any questions?

  • After the installation, did the technician discuss the following topics with the customer?

  • Thermostat settings

  • Warranty information

  • Maintenance agreements

  • Review request

  • Has the technician scheduled follow-up visits for routine maintenance and potential issues?

  • Have the technician completed and submitted all required documentation, including permits and inspection reports?

Completion

  • Additional Remarks

  • Name and Signature of Technician

  • Name and Signature of Customer

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.