Information
-
Document No.
-
Audit Title
-
Site
-
Conducted on
-
Location
-
Personnel
-
Prepared by
GENERAL INFORMATION
-
Company?
-
Region/ Division?
-
Manager in Charge?
-
Foreman in Charge?
-
Description of Work?
1.0 - REACTION OF PEOPLE
-
1.1 - Adjusting Personal Protective Equipment?
-
1.2 - Changing Position?
-
1.3 - Re Arranging Job?
-
1.4 - Stopping Job?
-
1.5 - Performing Lockouts?
2.0 - POSITION OF PEOPLE
-
2.1 - Striking against objects?
-
2.2 - Struck by objects?
-
2.3 - Caught in, on or between objects?
-
2.4 - Trips, slips or falls?
-
2.5 - Lifting, stretching, repetitive movements?
-
2.6 - Awkward position?
-
2.7 - Contact with temperature extremes?
-
2.8 - Contract with electricity (underground, overhead services)?
-
2.9 - Inhaling, ingesting, overcome by hazardous materials?
3.0 - PERSONAL PROTECTIVE EQUIPMENT
-
3.1 - Head
-
3.2 - Eyes and Face
-
3.3 - Ears
-
3.4 - Hi Viz Clothing
-
3.5 - Long Legs and Arms
-
3.6 - Feet
-
3.7 - Hands
4.0 - TOOLS AND EQUIPMENT
-
4.1 - Correct tools and equipment for the job?
-
4.2 - Plant and tools used correctly?
-
4.3 - Safety equipment devices installed (signs, barriers, pins, guards, seat belts, certification tags)?
-
4.4 - Tools and equipment in a safe condition?
5.0 - PROCEDURES AND HOUSEKEEPING
-
5.1 - Correct procedures followed?
-
5.2 - Procedures not known or understood?
-
5.3 - Housekeeping standards adequate?
-
5.4 - Housekeeping standards not known/ understood?
6.0 - VEHICLE PRE START
-
6.1 - Sheets completed
-
6.2 - Sheets completed as per company procedures and timeframes?
7.0 - LOGBOOKS
-
7.1 - Filled out correctly, ie breaks, no abbreviations, readable?
-
7.2 - Filled out up to the last 24 hour break?
8.0 - SITE INDUCTION
-
8.1 - Was a full induction completed as per the company expectations?
-
8.2 - Had the hazard ID been completed daily?
-
8.3 - Has everyone on site completed the site induction and signed the hazard ID?
-
8.4 - Is everyone on site following the requirements of the hazard ID?
-
8.5 - Is there an approved traffic management plan on site?
9.0 - TRAFFIC MANAGEMENT
-
9.1 - Is there an approved and signed copy of the TMP on site?
-
9.2 - Is the traffic management set out as per the approved TMP?
-
9.3 - Are all signs, cones and hi viz clothing in an acceptable condition?
-
9.4 - Safety zones, (longitudinal, lateral and taper) are free of plants and equipment, materials and personnel?
Sign Off
-
On site representative
-
Auditor's signature