  • Hydro-Mobile M2 Daily Inspection list

  • Skanska at Capitol View

  • Conducted on

  • Prepared by

Base

  • Ensure base is level and that cribbing under metal/wood mud sills has not moved.

  • Ensure that perimeter of setup is safe and that appropriate fencing (warning tape, concrete blocks or other type of fencing) is installed to prevent any unauthorized access.

  • Make sure construction traffic is controlled on and around job site (proper barriers installed).

Access

  • Make sure mast are plumb (both side and front axis)

  • Make sure all mast toggle bolts and nuts are in position and fastened properly

  • Make sure wall ties are in good condition and secure (collision with plank or wall tie door can damage ties)

Platform

  • Make sure all safety guardrails are in position and that sliding doors are operational (no fall hazard)

  • Ensure that work and circulation areas on platform are clear of debris

  • Make sure that planking is in good condition and set properly. Make sure that planking clears the building, balconies, etc. and that it is properly supported, overlapped and secured.

  • On special facade shapes, make sure that cross box kits, face guardrails and plank guardrails are properly installed and stable.

  • Make sure that cylinder hooks, secondary hooks and lowering cams are in good condition and functioning properly.

  • Visually inspect the safety hooks and make sure they can move freely.

  • Visually inspect the rollers (32 per motorized unit) and make sure they are all in position and operational. Grease the rollers weekly. Use Prolab GS-100 only.

  • Check all fluid levels including gasoline and replenish if necessary.

  • Before raising or lowering the platform, make sure it clears the building, balconies, etc.

  • Visually inspect the structure and its components and make sure there aren't any damages.

Loads

  • Make sure that loads on the platform do not exceed those prescribed by the capacity charts. Make sure loads are equally distributed.

  • Make sure that all access doors and wall tie doors are clear of material and equipment.

Bridges

  • On linear bearing bridges, make sure there is a 6" to 12" (15cm to 30cm) overlap at each end and that bridge safety chains are tied properly with a slack not exceeding 1" (2,5 cm)

  • On angled bearing bridges, make sure there is proper overlap and that special chains are installed on the bridge and the motorized unit undercarriage.

General

  • Make sure minimum clearance from overhead power lines is maintained according to SIA standards and local regulation.

  • Make sure a legible copy of operator's manual is in tool box.

Signature of Competent Person(s) that conducted daily inspection.

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.