Site Information
-
Site Name
-
Site Number
-
Site Contact Name
-
Contact position at the site
-
Site contact telephone number
-
Site contact email address
-
Can site contact be used as a point of contact for deliveries and liaise with 3rd party contractors prior to site team arrival
Site Questionnaire
-
Are welfare facilities available for install team
-
Where are they located
-
Is secure storage available on site
-
Is there an area that can be fenced off for external storage
-
Description and images of area to be fenced off
-
Is access available for 40ft trucks
-
Is there a pallet truck on site that can be used
-
Are there any listed buildings on or near the site
Electrical
-
Import meter location
-
Import meter serial number
-
Where is the fire panel located
-
Is there a backup generator on site
-
Is there a UPS on site
-
Does site already have solar panels
Roof Survey
-
Name of building and roof
-
Height of the roof in meters
-
Is there any shading impacting the roof
-
Roof type
- Concrete tile
- Slate
- Rosemary
- Trapezoidal
- Standing seam
- Single ply membrane
-
Is gravel present
-
When was the roof last installed or replaced
-
What is the condition of the roof
-
Is the roof under warranty
-
Is an adequate access method for install already in place
-
What is the recommended roof access type
-
Where is the roof access to be sited
-
Is adequate fall protection in place
-
Is there a Lightning Protection System in place
Inverter location and AC & DC wiring
-
Detials of DC cable route
-
Cable penetration method
-
Inverter location
-
Inverter location photos
-
Cable route from inverter to Main Point of Connection
-
Images of cable route
-
Length of inverter cable run
-
Final connection method to site supply
-
Images of existing DB
-
Photos of existing mains set up
-
Add media
Asbestos and Ecology
-
Is there Asbestos on site
-
Where is the register
-
Has the register been examined by the inspector
-
Are the cable routes or equipment locations affected by Asbestos
-
Take images of the surrounding areas that may be impacted by installation works
-
Is there bats in the vicinity of the roof
-
Is there any other protected species in the vicinity of the works
Additional information
-