Audit
Compliant - Completed, no problems found
Non-compliant - Completed, problems noted & repairs required
Rectified - Completed, problems corrected
Incomplete - Unable to perform inspection or additional work to be done.
Banlaw Job Number:
Order Number:
01-Banlaw FMS (Banlaw BFTE1A, 3546)
02-Code Hose / Hoses
03-Connection fitting (CAMLOCK 3", MALE)
04-Non-return vale (UNKNOWN 3" WAFER)
05-Ball valve (SWAN 3" MANUAL BALL)
06-Strainer
07-Pump (Regent 2000 80SP-177C-2233/V)
08-Motor (TECO 7.5KW, 14.3A)
09-Pipe work (3")
10-Bulk Air eliminator
11-Filter
12-Flow Meter / Pulser
13-Cla-Val Valve
14-Pressure Relieve For Thermal Expansion
15-Flow switch
16-Temperature Probe
17-Gate valve
18-Actuated N / C Fire Safe Valve
19-Overfill Protection Control Unit
20-Pressure Relieve For Thermal Expansion
01-Diesel Tank (DTE T55KL)
02-Water drain N / C (SELF BUNDED)
03-Overfill Protection System Level Switch (TANK BOSS BI4000H)
04-Tank level sensor
05-Temperature sensor
06-Pressure / Vacuum Relief Valve
07-Tank Vents
01-Manual Isolation Valve (SWAN 2" MANUAL BALL)
02-Actuated N / C Fire Safe Valve
03-Pressure Relieve For Thermal Expansion (SAFETY VALVE L3 45PSI)
04-Strainer (LC A2340, 151834)
05-Pump (CORKIN CORO VANE PZ10NSID2EE, 286397.11)
06-Motor (WEG K21BW22 - 5.5KW)
07-Air eliminator (LC A8197, 138288)
08-Flow Meter (LC M-10-1, 597423)
09-Pulser (VEEDER ROOT 767163-305, 14606)
10-Mechanical Register (VEEDER ROOT 0788700-064)
11-Temperature Probe (BANLAW PT100)
12-LV Hose Reel (GRACO 1" 237728, L11B )
13-HV Hose Reel
14-Power Station Transfer Pump (REGENT 508P159T288/D)
15-Power Station Transfer Motor (TECO AEHB-UCC2N - 2.2KW, 4.1A)
16-Power Station Transfer Isolation Valve (UNKNOWN 2" MANUAL BALL)
17-Absorb and Roughing Filter
18-LV Solenoid Authorisation (PROCESS SYSTEMS B55-6-25-1B, G12WAY)
19-HV Solenoid Authorisation (PROCESS SYSTEMS B55-8-35-1B, G 1 1/2 2WAY)
20-LV Nozzle (ZVA 25)
21-HV Nozzle
22-Day Tank Power Station (1 x 1000litre)
23-Polishing Filter
24-Actuated N / C Valve
25-Pressure Relieve For Thermal Expansion
26-Loading Arm
27-Breakout Point
28-Break-away Valve
29-Flexible Wire Braided fuel Hose & Data Wire Assembly
30-Swivel & Inlet Probe
31-Banlaw High Flow Nozzle
32-Banlaw Nozzle Holster
Inspection Comments
Recommendations
NOTE: All non-compliant results will followed up by Banlaw Service. Work required will be quoted then submitted for review, approval and scheduling.