Information
IAEC Job Site Observation
-
REC Name
-
REC Contact person
-
Conducted on
-
Prepared by
-
Location of observation (individual report per location)
CREW MEMBERS
Person In Charge
-
undefined
TEAM Member names
-
undefined
-
undefined
OPERATING PROCEDURE MODIFICATIONS
-
Are there any Operating Procedures different from the IAEC Operating Procedures being practiced
DESCRIPTION OF WORK BEING PERFORMED
-
undefined
-
Add media
STARTING THE JOB
-
Employee in charge on site
-
Documented Tailgate - hazards, special precautions, energy source controls, PPE required and employee fitness
-
Any alternative energy sources to be aware of (wind, solar, etc.)
-
Tailgate kept in standard location at job site (foreman truck, on cone by truck etc.)
-
Adequate number of crew for the job
-
Proper rated FR clothing available
-
Conductive articles (jewelry) removed when working energized equipment
-
One call notified
-
Horseplay noticed
-
Weather conditions
-
Terrain conditions in work area
-
Member permission sought when working on private property
-
undefined
CONDUCTOR WORK (includes energized, de energized and de energized and grounded work)
-
Qualified Employee doing work
-
Cover-up used
-
Used proper amount of cover-up
-
Gloves and sleeves (if applicable) worn cradle to cradle, lock to lock and ground to ground
-
Proper class of glove worn
-
Protectors in good condition
-
Proper class of sleeve worn
-
Proper rated FR clothing worn
-
Observer watching
-
Breaker set on one shot/hotline tag
-
Proper disconnection of energized equipment
-
Good practices during switching of circuits
-
Proper LOTO practices
-
One person in charge of clearance
-
Tested for absence of voltage prior to grounding
-
Ground clamps in good condition
-
Grounds installed with live line tool
-
Grounded properly (ground connection first to make last to break?)
-
Running grounds used
-
If multiple crews - proper communication used
-
undefined
-
Add media
AERIAL DEVICES
-
Boom clean
-
Pre-flight of controls
-
Controls marked
-
Wheels chocked
-
Outrigger pads used
-
Proper fall protection worn
-
Fall protection has compliant tags (harness and lanyard)?
-
Trucks grounded
-
Trucks properly barricaded (using an acceptable physical means)
-
Correct amount of fiberglass out when needed
-
Co workers rubber gloves located outside of truck for possible bucket rescue
-
Used approved device and method when lifting equipment (OH transformers, material, OCR's etc.)
-
Winch line on device being used to lift is free of damage/defects
-
Load being lifted was within rated capacity of equipment
-
Proper hand signals/communication occurred between operator and crew when maneuvering load
-
Maintained positive control of load
-
IAEC Best Practice suggestions (Suggestions to work more safely while performing specific procedures)
-
undefined
NEUTRALS
-
Bridged before opening
-
Proper communication used
-
undefined
CLIMBING
-
Employee certified as climber
-
Inspected tools before climbing
-
Sharps on hooks guarded
-
Long sleeve shirt worn while climbing
-
Hand line used
-
Co workers climbing gear out of truck and ready if needed for pole top rescue?
-
Best practice suggestions
-
undefined
-
Add media
POLES
-
Hauled properly (Including flag and/or light at end of pole?)
-
Proper Gloves worn while handling (rubber gloves when applicable)
-
Proper cover-up when setting pole near an energized system
-
Used pole puller to remove pole(s) being being replaced
-
Pole tongs used
-
Crew avoided being underneath suspended loads
-
Crew maneuvered load to avoid getting caught between objects
-
When maneuvering pole, pole was balanced properly for person on ground to maintain positive control and to avoid injury
-
Proper hand signals/communication occurred between operator and crew when maneuvering load
-
Maintained positive control of load
-
Safe practices used when framing pole(s)
-
Safe practices used when stowing and un stowing auger
-
Safe practices used when augering hole for pole and/or drilling anchor
-
Auger strap/cable is compliant
-
Safe practices used when setting pole
-
Add media
TRAILERS
-
Current registration
-
Current DOT inspection
-
Select date
-
Current Fire Extinguisher inspection date
-
Select date
-
Safety devices and features in good operating condition
-
Wheel chocks used when applicable
-
Adequate number of tie downs used
-
Adequate rated tie down used for load securement
-
undefined
-
Add media
MISC EQUIPMENT (Other CMV's or equipment such as backhoes, dozers, forklifts, skidsteers, ATVs etc.)
-
Type of equipment
-
Add media
-
Current DOT inspection
-
Current registration
-
Current Fire Extinguisher inspection date
-
Select date
-
Safety devices and features in good operating condition
-
Wheel chocks used when applicable
-
Seat belt worn while operating equipment
-
Add media
VEHICLES
-
Daily inspection completed
-
Current insurance and accident information in vehicle
-
Current inspection date of First Aid, Fire Extinguisher and BBP kit
-
Select date
-
Select date
-
Select date
-
AED battery life indicator good
-
Seat belts worn while in transit
-
Interior/exterior well kept
-
Adequate Cargo Securement practices
-
Adequate tire inflation and tread depth
-
Back up alarms working
-
Current dielectric test
-
Select date
-
Current DOT annual inspection
-
Select date
-
undefined
-
Add media
TRAFFIC CONTROL
-
High visiblility vests worn (including compliant class of vest)
-
Proper size signs used in accordance with traffic control rules and regs
-
Proper size cones used in accordance with traffic control rules and regs
-
Minimum 5 cones used as promoted by IAEC Safety
-
Flagger used when needed
-
Proper flagging equipment
-
Flagging done properly
-
Four way flashers used
-
Strobe/Rotating light in use
-
IAEC Best Practice suggestions (Suggestions to work more safely while performing specific procedures)
-
undefined
-
Add media
URD WORK
-
Competent person on job site
-
Adequate trench protection
-
Means of egress in trench
-
Spoils 2ft from trench
-
Cables spiked before cutting
-
Compliant signage on cabinets (warning/danger)
-
Proper lock to lock practices followed
-
Cabinets locked with dual locking system (penta bolt and padlock)
-
Used approved device and method when lifting URD equipment (transformers, switchgear, peds etc.)
-
Load being lifted was within rated capacity of equipment
-
Crew avoided being underneath suspended loads
-
Crew maneuvered load to avoid getting caught between objects
-
Proper hand signals/communication occurred between operator and crew when maneuvering load
-
Maintained positive control of load
-
When making terminations - safe practices took place and proper PPE worn
-
Used live line tools properly when pulling or plugging in elbows
-
When operating excavation equipment (including trenchers) - safe practices took place
-
undefined
-
Add media
TREE TRIMMING
-
Proper PPE worn (chaps, hearing, eye/face and head protection etc.)
-
Safe operation of chainsaw took place (Started safely/used chain break etc.)
-
Chainsaw fueled 10' or more from work zone
-
Chainsaw scabbard in place over bar/chain when not in use?
-
Chainsaw safety features operable
-
PPE used during chemical application
-
Sprayers labeled properly
-
Co workers in safe work zone from chainsaw operator
-
Rubber gloves worn when needed
-
Employee tied in when in tree
-
Cables in good condition
-
Best practice suggestions
-
undefined
-
Add media
SUBSTATIONS
-
Qualified employee for level of work being performed
-
Proper PPE worn
-
Ladders are free of damage and have compliant labels
-
Observer watching
-
Substation gate properly secured during work process
-
Substation is compliant with applicable regulations
-
IAEC Best Practice suggestions (Suggestions to work more safely while performing specific procedures)
-
undefined
-
Add media
ROPES, SLINGS, STRAPS, HOISTS, CHAINS
-
Strap hoists compliant
-
Chain hoists compliant
-
Ropes in good condition (including hand lines and rope locks)
-
Slings compliant
-
Chains compliant
-
Straps compliant (pole rack straps, auger strap, tie down straps etc.)
-
undefined
-
Add media
TOOLS
-
Battery, electric, hydraulic and hand tools stored properly
-
Cords in good condition
-
Hydraulic hoses/connectors in good condition
-
Sharps guarded when not in use
-
Correct tool used for the job
-
Proper PPE worn with tool being used
-
Tool safety devices in place and working
-
Avoided pinch points while operating tools
-
undefined
-
Add media
LIVE LINE TOOLS, JUMPERS AND GROUND TEST DATES
-
Live line tool test date compliant
-
Select date
-
Proper length, Clean and free of moisture, Stored properly
-
Jumpers/Macs test date compliant
-
Select date
-
Grounds test date compliant - Bi Annual according to Operating Procedures
-
Select date
-
Hot arm test date
-
Select date
PROTECTIVE WEAR - HEAD, EYE, FACE AND HEARING
-
Compliant Z-89 Class E hard hat
-
Clean
-
Compliant Z87 eyewear
-
Side shields
-
Head and eye protection worn
-
Approved face shield worn (if required per arc flash study)
-
Decibel reading from smart phone app (Db reading of 85 or above is an at risk level)
-
Hearing protection worn (85 dB and above, hearing protection shall be worn - time weighted average does apply).
-
undefined
RUBBER GOODS TEST DATES
-
Rubber gloves test date compliant
-
Select date
-
Rubber sleeves test date compliant
-
Select date
-
Cover up compliant test date (rubber hoses/guts, blankets, hard cover up)
-
Select date
-
undefined
-
Rubber goods (including gloves and sleeves) are stored properly when not in use?
SUGGESTIONS TO IMPROVE OVERALL PERFORMANCE - 'Coaching to Improve What is Wrong and Recognizing What is Right'
-
undefined
TEAM MEMBER SIGNATURES - confirms job site observation detail has been discussed with you
-
Add signature
-
Add signature
-
Add signature
-
Add signature
-
Add signature
-
Add signature
-
Add signature
-
Add signature
-
Add signature
-
Add signature
-
Add signature
undefined
IAEC SAFETY PERSONNEL SIGNATURES
-
Add signature