Title Page

  • Audit Title

  • Client / Site

  • Contract details/Scope of works

  • Project Lead

  • Conducted on

  • Prepared by

  • Location

Appointments

  • Has Principal Contractor been appointed (If applicable)

  • Has Principal Designer been appointed (if applicable)

  • Has Contractor been appointed

  • Has Designer been appointed

  • Have all appointees competences been checked/confirmed

  • Has H&S impact assessment form been utilised at project commission stage?

Coordination/communication

  • Have methods of project cooperation been established?

  • Are clear procedures in place for management of the H&S aspects of the project?

  • Has the client provided suitable and sufficient Pre Construction Information to enable designers and contractors compliance?

  • Has asbestos survey been provided by the client and is it suitable and sufficient for the scope of works?

  • Has the Construction Phase H&S Plan been issued prior to works starting on site?

  • Is H&S Plan updated as required during construction phase?

  • Are there suitable and sufficient Risk Assessments and Safe Methods of Work evidenced for types of activities taking place in the project?

  • Is there a project risk assessment/risk register identifying all relevant risk areas and control measures in relation to the design stages and overall project management aspect of the work?

  • Is there evidence of regular meetings to discuss project H&S aspects?

Pre Construction Phase

  • Is there evidence of Design Safety Review?

  • Is there evidence of Design Project Risk Assessment?

  • Has consideration been given to arrangements and access to welfare facilities?

Construction Phase H&S

  • Is access to suitable welfare facilities available from the outset of the project?

  • Are site safety inspections taking place?

  • Does client receive regular reports on H&S performance of contractors?

  • Is there evidence of communication of H&S issues/incidents and resolutions?

Notifications

  • Is there evidence of an F10 notification issued on time with sufficient information included (notifiable projects only)

H&S File

  • Has H&S file been produced?

  • Does the H&S file include all relevant information?

  • Has the H&S file been made available to relevant persons?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.