Information

  • Project Name

  • Conducted on

  • Location
  • Field Supervisor

  • Project Manager

  • Prepared by

JOBSITE SIGNAGE

  • Job Site Standards professionally posted

  • iConstructors tenant signage properly displayed

  • Fire Sprinkler Shutoff Valve properly labeled and identified

  • Water Shutoff Valves properly labeled and identified

  • Proper use of punch dots

PRESENTATION

  • iConstructors walk-off mats on-site and walk off mats used effectively

  • All common area including Lobbies and Corridors are spotless

  • Freight elevator clean including door tracks

  • Restrooms clean

  • Electrical & Mechanical Rooms are clean

  • Construction debris properly disposed and dumpster location free of all debris

JOB SITE PROTECTION

  • Plywood under wheels of dumpster, if on asphalt

  • Smoke detector protection properly installed

  • Filter media properly secured on all return air dampers and grills

  • Flooring/Wall/Millwork protection to iStandards

  • Mini-blinds raised or bagged to preclude dust, if existing

  • iConstructors wall protectors properly utilized

  • Vacuum cleaner onsite and working

PERMIT BOARD

  • Permit board onsite and clean

  • Permit drawings inside permit board and permits posted neatly on permit board

  • First Aid Kit properly stocked and on-site

  • iConstructors Safety Manual on-site

  • All required SDS Sheets on-site

SAFETY

  • Fire extinguisher onsite and charged

  • Water properly provided for all job site personnel

  • All electrical power provided through OSHA approved GFI receptacles

  • All electrical cords used are safe and a minimum of 14 gauge wire

  • All job site personnel are wearing hard hats

  • Proper, safe lighting provided throughout the job site

ORGANIZATION

  • iConstructors storage container properly organized

  • Field Supervisor drawings have been properly reviewed and color coded to reflect important notes, exceptions, concerns, and construction legend depiction

  • Field Supervisor drawings are properly organized, 100% complete, update to include all revisions, and revisions are securely inserted on top of superseded drawings

  • All salvaged material identified and properly stored to facilitate reuse

  • Job site materials are organized in a professional manner

  • Overall, job site is neat, orderly, and professional in appearance

  • PHOTOS

  • Comments

  • Person that completed the report

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.