Information
-
Project Name
-
Conducted on
-
Location
-
Field Supervisor
-
Project Manager
-
Prepared by
JOBSITE SIGNAGE
-
Job Site Standards professionally posted
-
iConstructors tenant signage properly displayed
-
Fire Sprinkler Shutoff Valve properly labeled and identified
-
Water Shutoff Valves properly labeled and identified
-
Proper use of punch dots
PRESENTATION
-
iConstructors walk-off mats on-site and walk off mats used effectively
-
All common area including Lobbies and Corridors are spotless
-
Freight elevator clean including door tracks
-
Restrooms clean
-
Electrical & Mechanical Rooms are clean
-
Construction debris properly disposed and dumpster location free of all debris
JOB SITE PROTECTION
-
Plywood under wheels of dumpster, if on asphalt
-
Smoke detector protection properly installed
-
Filter media properly secured on all return air dampers and grills
-
Flooring/Wall/Millwork protection to iStandards
-
Mini-blinds raised or bagged to preclude dust, if existing
-
iConstructors wall protectors properly utilized
-
Vacuum cleaner onsite and working
PERMIT BOARD
-
Permit board onsite and clean
-
Permit drawings inside permit board and permits posted neatly on permit board
-
First Aid Kit properly stocked and on-site
-
iConstructors Safety Manual on-site
-
All required SDS Sheets on-site
SAFETY
-
Fire extinguisher onsite and charged
-
Water properly provided for all job site personnel
-
All electrical power provided through OSHA approved GFI receptacles
-
All electrical cords used are safe and a minimum of 14 gauge wire
-
All job site personnel are wearing hard hats
-
Proper, safe lighting provided throughout the job site
ORGANIZATION
-
iConstructors storage container properly organized
-
Field Supervisor drawings have been properly reviewed and color coded to reflect important notes, exceptions, concerns, and construction legend depiction
-
Field Supervisor drawings are properly organized, 100% complete, update to include all revisions, and revisions are securely inserted on top of superseded drawings
-
All salvaged material identified and properly stored to facilitate reuse
-
Job site materials are organized in a professional manner
-
Overall, job site is neat, orderly, and professional in appearance
-
PHOTOS
-
Comments
-
Person that completed the report