Information
Site Information
-
Site Name and Address
-
IDF/MDF Maintenance Tracker
-
IDF location and name:
-
Conducted on
-
Prepared by
Site Keybox
-
Key Box Location Photo
-
Key Box Location Detail
-
Key Box Code
-
Proper Wall Attachment
- Yes
- No
- N/A
-
Keybox Physical Condition/Fuctionality
-
Keybox Lubricated
MDF/IDF Enclosure Condition
-
Pre-Inspection Picture(s) of space
-
Is trash removed from space?
- Yes
- No
- Remove the trash or contact EVS
-
Floors swept or enclosure vacummed?
-
Lighting adequete?
-
Ventalation adequete?
-
Is the cabinet/rack big enough?
-
Is equipment Mounted and Secure?
-
Door(s) Locks functional?
Field Tech Responsibility
UPS information
-
Add photo(s) of UPS(s)
-
How many UPS's?
- 1
- 2
- 3
- 4
- 5
- 6
-
UPS(s) plugged into critical power?
- Yes
- No
- If not plug into critical power.
-
UPS(s) networked?
- Yes
- No
- Is NIC installed? if so patch it in.
- In no NIC, order one for UPS
-
UPS Model: (note: if other is sewlected please note in the audit)
- APC Smart 1500
- APC Smart 2200
- APC Smart 3000
- Other
-
UPS Model: (note: if other is sewlected please note in the audit)
- APC Smart 1500
- APC Smart 2200
- APC Smart 3000
- Other
-
UPS Model: (note: if other is sewlected please note in the audit)
Switch information
-
Add photo(s) of switch(es)
-
How many switch stacks?
- 1
- 2
- 3
- 4
- 5
- 6
-
Switches have redundant power supplies?
- Yes
- No
- Can they have 2? If so plug it in
- If it cannot have 2 power supplies contact Network Engineers
-
Switch model:
- RUCKUS ICX 7150
- RUCKUS ICX 8200
- Cisco Catalyst 3750-X
- Cisco Catalyst 2960
- Other Please list in Comment Section.
-
How many switches in the stack?
- 1
- 2
- 3
- 4
- 5
- 6
-
Switch model:
- RUCKUS ICX 7150
- RUCKUS ICX 8200
- Cisco Catalyst 3750-X
- Cisco Catalyst 2960
- Other Please list in Comment Section.
-
How many switches in the stack?
- 1
- 2
- 3
- 4
- 5
- 6
Cable information
-
Pre-inspection Picture
-
Is the Patch Pannel Clearly labeled?
-
Are the Cables Clearly Labeled?
-
Are any of the RJ45 Connectors damaged?
-
Do jumpers need to be replaced for uniformity/management
-
Cable management Summary: i.e. What was done to improve
-
Post Labeling and Cable Management
In-unit visits- 10/100M Links
-
List Switchports with less than 1gig Links
-
List steps to resolve in unit issues
-
Upload Before, during, and after Images of all in-unit work completed, and confirmation of Giglink eg. verification/cable test results.
-
Cable Management: i.e. How We can improve/additional hardware required
Contact Info
-
For Work Orders: David Hopper +18142057598 david.hopper@dojonetworks.com
For Network Engineers: +15703603663 ryan.basko@dojonetworks.com
Additional Details
-
Comment Section