Title Page

  • I.D.I. Job Number

  • Job Site Name

  • Conducted on

  • I.D.I. QAQC Inspector

  • Job Site Area of QAQC Inspection

  • Confirm for updated drawings, RFI's, plans & specs

  • Have all draw-downs been submitted and approved

  • Confirm that the taping quality is ready for paint prior to finish coat

  • Do any walls receive a level 5 finish

  • Have all MEP trades completed their work (including any demo and re-installation)

  • Were all drywall patches sanded

  • Were drywall patches spot primed

  • Confirm the ceiling and floor base heights are finish taped to the right height

  • Is the lighting adequate to install the finish coat

  • Are all trades complete before the installation of any specialty finishes

  • After applying the finish coat, are all walls free from damage

  • Do all surfaces have a uniform finish

  • Have you walked the project looking for imperfections prior to the architect creating a punch list

  • Confirm clean-up of our material and scrap

  • Did you walk and inspect the job site with the G.C.

  • Comments

  • Sign Off

  • I.D.I. QAQC Inspector

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.