Title Page
-
I.D.I. Job Number
-
Job Site Name
-
Conducted on
-
I.D.I. QAQC Inspector
-
Job Site Area of QAQC Inspection
-
Confirm for updated drawings, RFI's, plans & specs
-
Have all draw-downs been submitted and approved
-
If precast or concrete, does the substrate need to be power washed
-
Confirm that all items not to receive paint have been protected from overspray
-
Confirm that duct work or any other form of air movement has the correct filters installed to reduce fume transfer
-
Are all surfaces free of rust, stains, fireproofing, or anything else that may cause a flaw to the finish surface
-
Confirm that all substrates are at the correct temperature to receive material
-
Confirm that all substrates are not wet or contain too much moisture
-
If precast or concrete, is the pH level at an acceptable range
-
Is the wind calm enough not to cause overspray to carry a distance
-
Have all trades either moved or protected their stored materials from overspray
-
Are all MEP's complete before spray
-
Have sprinkler heads been protected from spray
-
Have smoke detectors been protected from spray
-
Confirm the paint is the correct product from the correct manufacturer
-
Are all coatings applied to the correct MIL thickness
-
Do all sprayed surfaces have a uniform finish
-
Have all protection materials (i.e. tape, plastic, foil) been removed from items that were being protected (i.e. hinges, convectors, sprinkler heads)
-
Look for imperfections before the architect creates the punch list
-
Confirm clean-up of our material and scrap
-
Did you walk and inspect the job site with the G.C.
-
Comments
-
Sign Off
-
I.D.I. QAQC Inspector