Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Crane has adequate access around site?
-
Adequate room for crane assembly/disassembly?
-
Weather Conditions
-
Pre-planning meeting conducted before assembly/disassembly?
-
Qualified person supervised assembly/disassembly?
-
Crane selected is appropriate for load capacity and reach?
-
Crane operator training verified?
-
Crane's annual inspection available?
-
Crane setup on stable surface - Compacted soils, Drained, Firm?
-
Outriggers extended - Wheels off ground?
-
Crane setup level?
-
Swing radius barricaded to prevent access - employee training?
-
Lift route planned to prevent worker exposure to falling loads?
-
Work Zone Defined
-
Crane could get within 20' of powerline?
-
Distance
-
Letter or notification from power company verifying powerline voltage received?
-
Non-Conductive tag lines in place?
-
A spotter, or
-
Qualified riggers present - Training verified?
-
Rigging equipment appropriate for load to be lifted?
-
Slings, spreader bars or chains checked for certifications?
-
Rigging inspected?
-
Qualified signal person present - training verified/documented?
-
Daily Pre-lift meeting conducted?
-
Competent person performed daily inspection and at each shift change?
-
Multiple crane use - Coordinate procedures
-
Multiple crane use - Critical lift plan in place?
-
Safety Manager
-
Superintendent/Foreman
-
Crane Operator