Job Safety Analysis

Introduction

  • Instructions for use of the checklist:
    * Complete all fields
    * You can use the Note and /or Image tabs found on each question to record issues with the inspection
    * You can use the 'Action' tab to assign actions to another person e.g repair or ordering an item

    Mobile-plant-prestart-note2-.jpg
  • Site Name
  • Job #

  • Job task

Planning & Preparation

  • Have all workers been informed of the site safety rules and procedures?

  • Check with the Site Manager or immediate supervisor to find out what OHS rules are applicable on site

    Caution-115.png
  • Has a site-specific induction and toolbox meeting been conducted with all workers?

  • Check with the Site Manager or your immediate supervisor to find out what OHS inductions and toolbox meetings are required on site. Make sure that all relevant workers attend before starting work.

    Caution-115.png
  • Have supervisory arrangements and reporting structures been confirmed?

  • Check with the Site Manager or immediate supervisor to confirm supervisory arrangements and reporting structures

    Caution-115.png
  • Have traffic management plans & no -go zones been identified?

  • Check with the Site Manager to review site/ traffic management plan if applicable. ( The plan may have critical information regarding no-go areas or other important information)

    Caution-115.png
  • Are work and entry permits completed and signed?

  • Only work on tasks that have approved permits in place. Check with the site manager or supervisor if unsure

    Caution-115.png

Licencing and Training

  • Do all workers have a construction white card (or approved alternative)?

  • Stop! Only workers with valid construction induction cards can go on site

    stop-sign.png
  • Have all workers undertaken training and/or received instruction in the use of health and safety control measures including, safe operating procedures, SWMS, and this JSA?

  • Stop! Do not enter the site if not instructed in health and safety control measures. e.g Safe use of equipment, following SWMS, etc

    stop-sign.png
  • Are workers licenced as required for the task?

  • Stop! Only workers with current, valid licences may undertake the task

    stop-sign.png

Personal Protective Equipment (PPE)

  • Select PPE

  • Is site-specific PPE available and in good condition?

  • Only wear PPE that is in good condition. If PPE is not available then do not continue with task until PPE becomes available.

    Caution-115.png

HIGH RISK CONSTRUCTION WORK

  • Does the job involve any of the following high risk construction activities? Tick if applicable.

  • Confined Space?

  • Do you have a SWMS on-site that addresses risks of confined space work?

  • STOP WORK! - Do not continue work until an applicable SWMS is on-site and has been reviewed by all workers

    Stop-sign 115px.png
  • Powered Mobile Plant?

  • Do you have a SWMS on-site that addresses risks of working with powered mobile plant?

  • STOP WORK! - Do not continue work until an applicable SWMS is on-site and has been reviewed by all workers

    Stop-sign 115px.png
  • Demolition Work?

  • Do you have a SWMS on-site that addresses risks of the demolition work?

  • STOP WORK! - Do not continue work until an applicable SWMS is on-site and has been reviewed by all workers

    Stop-sign 115px.png
  • Asbestos?

  • Do you have a SWMS on-site that addresses risks of working with asbestos?

  • SSTOP WORK! - Do not continue work until an applicable SWMS is on-site and has been reviewed by all workers

    Stop-sign 115px.png
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor?

  • Do you have a SWMS on-site that addresses risks of working adjacent to a road, railway or shipping lane, traffic corridor?

  • STOP WORK! - Do not continue work until an applicable SWMS is on-site and has been reviewed by all workers

    Stop-sign 115px.png
  • Involves a risk of a person falling more than 2m, including work on telecommunications towers?

  • Do you have a SWMS on-site that addresses risks of working at height?

  • STOP WORK! - Do not continue work until an applicable SWMS is on-site and has been reviewed by all workers

    Stop-sign 115px.png
  • Structures or buildings involving structural alterations or repairs that require temporary support to prevent collapse?

  • Do you have a SWMS on-site that addresses risks of work involving structural alterations or repairs?

  • STOP WORK! - Do not continue work until an applicable SWMS is on-site and has been reviewed by all workers

    Stop-sign 115px.png
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations/services ?

  • Do you have a SWMS on-site that addresses risks of working with or adjacent to pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations/services?

  • STOP WORK! - Do not continue work until an applicable SWMS is on-site and has been reviewed by all workers

    Stop-sign 115px.png
  • Tilt up or pre-cast concrete?

  • Do you have a SWMS on-site that addresses risks of working with tilt-up or precast concrete?

  • STOP WORK! - Do not continue work until an applicable SWMS is on-site and has been reviewed by all workers

    Stop-sign 115px.png
  • Working at depths greater than 1.5 Metres, including tunnels or mines ?

  • Do you have a SWMS on-site that addresses risks of working at depths greater than 1.5 Metres, including tunnels or mines?

  • STOP WORK! - Do not continue work until an applicable SWMS is on-site and has been reviewed by all workers

    Stop-sign 115px.png
  • Work in an area that may have a contaminated or flammable atmosphere?

  • Do you have a SWMS on-site that addresses risks of working in an area that may have a contaminated or flammable atmosphere?

  • STOP WORK! - Do not continue work until an applicable SWMS is on-site and has been reviewed by all workers

    Stop-sign 115px.png
  • Using explosives?

  • Do you have a SWMS on-site that addresses risks of working with explosives?

  • STOP WORK! - Do not continue work until an applicable SWMS is on-site and has been reviewed by all workers

    Stop-sign 115px.png
  • Diving work?

  • Do you have a SWMS on-site that addresses risks of diving work?

  • STOP WORK! - Do not continue work until an applicable SWMS is on-site and has been reviewed by all workers

    Stop-sign 115px.png

Other hazards identified

  • Are there any additional hazards not identified in existing SWMS/Safe Operating Procedures?

  • Identify the hazard and put in place measures to control the risk using the hierarchy of controls

    8bceadd0-5ca4-11e8-9d16-2ba77d54284b (1).jpeg
  • Hazard
  • Description of hazard

  • Take photo of hazard (Optional)

  • Use drawing (Optional)

  • Enter control measures for hazard

View Documents

  • You can view uploaded PDF Safe Work Method Statements or other pdf documents here. Click on 'Open Document" to review the applicable instruction

  • Example SWMS - Excavation and working in trenches

  • Example SWMS - Working at Heights

  • Example SWMS - Manual Handling

  • Example SWMS - Working near mobile plant

  • Example SWMS -Slips,trips and falls

  • Example SOP - Working on mobile scaffold

  • Are all relevant SWMS/SOPs on-site and readily accessible?

  • Stop! Make sure that relevant SWMS or other work instructions are on-site and readily available. If required SWMS /Safe work instruction is unavailable, contact supervisor for advice before commencing work.

    stop-sign.png
  • Have all relevant SWMS, or other work instructions, been reviewed and understood by all workers?

  • Stop! Make sure that relevant SWMS have been reviewed and understood by workers before commencing the task. If required SWMS /Safe work instruction is unavailable, contact supervisor for advice before commencing work..

    stop-sign.png

Sign-off

  • Have all risks been reduced to the lowest acceptable level?

  • Stop! Make sure that all risk control measures are minimised as much as is reasonably practicable before commencing work.

    stop-sign.png
  • Risk-Matrix1.jpg
  • What is the overall risk rating after controls?

  • Do not proceed with work at acute risk levels !

    stop-sign.png
  • Consider additional controls to reduce risk levels to a lower level

    Caution-115.png
  • Will additional SWMS, Safe Work Procedures or training be required to assist workers in managing the risk?

  • Ensure workers review and understand the procedures or, have been provided additional training and instruction before commencing the task

    Caution-115.png
  • Signee:
  • (Signee's) that participated in this JSA

Buy Safety Documents

  • If you need additional health, safety, environmental or quality documents visit
    https://www.safetyculture.com.au

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.