Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
CHECKLIST
-
Project
-
Location
VERIFICATION:
-
Construction drawings approved for use
-
Drg. No
-
Rev. No.
-
Halgan ,Aglass, Mascot
-
Product approved for use
EXCAVATION :
-
Marked out as per drawing
-
Excavation to correct depth
-
10mm Aggregate bedding minimum 100mm thick
-
Chamber filled with water
-
All openings sealed to prevent debris entering
PIPE WORK:
-
Pipe install as per drawing
-
Are alterations to design required
-
Alterations approved by builder/designer
-
All pipework completed in area
-
Pipe size used
-
10mm Agg bedding around tank
-
Stabilised sand around tank
-
Compaction of back fill material
REINSTATMENT OF FINNISHED SURFACE:
-
Grass areas repaired
-
Concrete areas repaired
-
Asphalt areas repaired
COMMISIONING
-
All pipe work flushed and free of debris
-
CCTV inspection of new pipe work
-
sydney water approval application sent
CHECKS
-
Checked by
-
Signature
-
Date