Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

CHECKLIST

  • Project

  • Location

VERIFICATION:

  • Construction drawings approved for use

  • Drg. No

  • Rev. No.

  • Halgan ,Aglass, Mascot

  • Product approved for use

EXCAVATION :

  • Marked out as per drawing

  • Excavation to correct depth

  • 10mm Aggregate bedding minimum 100mm thick

  • Chamber filled with water

  • All openings sealed to prevent debris entering

PIPE WORK:

  • Pipe install as per drawing

  • Are alterations to design required

  • Alterations approved by builder/designer

  • All pipework completed in area

  • Pipe size used

  • 10mm Agg bedding around tank

  • Stabilised sand around tank

  • Compaction of back fill material

REINSTATMENT OF FINNISHED SURFACE:

  • Grass areas repaired

  • Concrete areas repaired

  • Asphalt areas repaired

COMMISIONING

  • All pipe work flushed and free of debris

  • CCTV inspection of new pipe work

  • sydney water approval application sent

CHECKS

  • Checked by

  • Signature

  • Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.