Title Page
-
Installer
- Ben Whaites
- Benjamin Jeffries
- Brad Dodd
- Brad Turnbull
- Brett White
- Callan Niedorfer
- Christopher Bonney
- Damien Brown
- David Robinson
- Don Degiglio
- Francesco Mammone
- Frank Bralic
- Jamin Ruben
- John Hancock
- John Petroff
- Joshua Payne
- Lachlan Buchanan
- Lloyd Coulson
- Marino Benzija
- Mark Van Kruyssen
- Matthew Measham
- Matthew Murcott
- Matthew Woods
- Michael Jackaman
- Mohamed Abdullahi
- Paul Foster
- Paul Hancock
- Sam Hamilton
- Sam Szalbot
- Samuel Shinakis
- Scott Thornton
- Steven Schultz
- Steven Storey
- Timothy Mccaffrey
- Troy Saffin
-
State
-
NMI
-
Address
-
Conducted on
-
Prepared by
-
Document No.
-
Job Type
- New Install
- Solar / Battery
- Faulty Meter
- EOL
- Comms / Removal
- RLR
Pre Start Inspection
-
Confirmed Customer is Notified
-
Customer Home
-
Asked if Customer has Life Support
-
Confirm Safe to Approach Test using Independent Earth with Low voltage mat down
-
Confirmed Correct Meter no. and Address
-
Inducted and asked visitors to sign on to WHRA
-
Has all Required PPE
-
Front Panel
SME Questions
-
Did technician have a good understanding of why we perform the NITP test.
-
Was the technician able to explain what neutral point the NST test is required to be performed from.
-
Was the technician able to explain the purpose of performing a low impedance test across a service fuse
-
acceptable knowledge of testing procedures
Pre Testing
-
Test Earthing System
-
Test 240 Volt
-
Test 415 Volt
-
NST Test
-
Phases Onsite
-
Phase Rotation
Meter Exchange
-
Supply Isolated
-
Supply Danger Tagged / Locked
-
Test for Dead
-
Rear Panel Photo
-
Work Site kept clear as possible for safe working
Equipment
-
LV Gloves In date (1 YEAR MAX)
-
Multimeter Calibrated
-
NST Tester Calibrated
-
Phase Rotation Meter
-
Load Tester
-
Megger
-
First Aid (in date 1 Year)
-
LV Rescue Kit
Pre Energisation Tests
-
Confirmed Earth and Neutral Systems
-
Marked NITP with white marker 3 locations minimum
-
Rear Panel Photo
-
Low Impedance
Post Energisation Tests
-
Test Voltage between NITP & Independent Earth
-
Test 240 Volt
-
Test 415 Volt
-
NST Test
-
Phase Rotation
-
Load Test
-
0-6 Volt Test
-
Terminal Photo
Final
-
Main Switch Reinstated
-
Job Left Clean and Tidy
-
All Metering Equipment Sealed
-
NMI Sticker Correct and Readable
-
ECOC Complete
-
Paperwork Given to Customer
-
Front Panel Photo
-
Feedback for Installer
-
Installer
-
Auditor