Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Select date
-
Add location
-
Draw an outline plan of the incident sectorisation.
-
Have you created a Safety Sector?
-
PPE
-
Is the PPE appropriate for the hazard and risk
-
Is PPE being worn correctly on the incident ground?
-
Signs of building collapse
-
Are any of the signs listed present?
-
Working on or near water
-
If crews are working on or near water is a safe system of work in operation?
-
Working at Height
-
If crews are working at height is a safe system of work in place?
-
Building Services
-
Which of the following services been isolated?