Title Page

  • Type of Report

  • Prepared by

  • Conducted on

  • Report completion date

  • Location
  • Customer name

  • Original or Present company name

  • Weather conditions locally

  • Reason for inspection/report/visit (overview)

  • Product/s type

  • Who is present?

  • This report is generally a non-intrusive visual inspection and has been prepared for the sole use of Independent Network, the sharing or copying of this report must be at the consent of Independent Network. If any unauthorised third party makes use of this report they do so at their own risk and Independent Network owe them no duty of care or skill.

    All information provided by others is taken in good faith as being accurate, however, Independent Network, does not accept any liability for the detailed accuracy, errors or omissions in such information.

    Whilst every effort was made to fully inspect those parts of the building requested of us, no permanent or secured fixtures and fittings were removed by us. We have not inspected any parts of the installation which were covered, unexposed or inaccessible and we are unable to report that any such part of the installation is free from defect.

    WITHOUT PREJUDICE

Introduction

  • As Technical Support Manager for Network VEKA I undertake annual audits of installer and fabricator companies within the fenestration industry

  • This includes installer and surveyor training to ensure installation standards are met under GGF, BSI and NHBC guidelines

  • I have over 35 years experience in the fenestration industry from Installer of Windows and Doors, Conservatory Installations, Service Engineer, Service Manager, Installations Manager, Project Manager, Surveyor, Surveyor Trainer, Operations Manager

  • I.O.S.H Associate Member <br>LEVEL 3 NVQ Certificate in Occupational Health and Safety (Nov 2021)<br>LEVEL 3 Award Education and Training (AET/PTLLS OCT 2019) <br>CSCS GOLD (expires 11/2023)<br>NVQ Alloy and Access Towers Certificate (Mar 2016)<br>NVQ In-House Access Tower Instructor (Mar 2016)<br>LEVEL 3 NVQ Certificate in Fenestration surveying (Nov 2011)<br>November 2006 CSCS Health and Safety cert 2006. <br>Fire Safety cert 2006. Entry Permit London Underground<br>Willesden College of Tech 1984-1987 <br>City & Guilds of London Institute advanced CARPENTRY AND JOINERY<br>

Documentation and Standards

  • BS8213-4 Code of practice for the survey and installation of windows and external door sets.
    Installation Guide of VEKA products
    GGF Good practice guide for the installation of replacement windows and doors.
    BS6262 parts 2-7 Glazing for buildings
    Approved Document A of the building regulations
    NHBC Guidelines
    Approved Document B1 of the building regulations
    Approved Document C of the building regulations Approved Document F1 of the building regulations
    Approved Document K2 & 3 of the building regulations
    Approved Document L1b of the building regulations
    Approved Document M of the building regulations
    Approved Document N of the building regulations (Wales only)
    Regulation 7 of the building regulations

1

  • Location

  • Works as required

  • Parts as required

  • Photos

  • Comments

2

  • Location

  • Works as required

  • Parts as required

  • Photos

  • Comments

3

  • Location

  • Works as required

  • Parts as required

  • Photos

  • Comments

4

  • Location

  • Works as required

  • Parts as required

  • Photos

  • Comments

5

  • Location

  • Works as required

  • Parts as required

  • Photos

  • Comments

6

  • Location

  • Works as required

  • Parts as required

  • Photos

  • Comments

7

  • Location

  • Works as required

  • Parts as required

  • Photos

  • Comments

8

  • Location

  • Works as required

  • Parts as required

  • Photos

  • Comments

9

  • Location

  • Works as required

  • Parts as required

  • Photos

  • Comments

10

  • Location

  • Works as required

  • Parts as required

  • Photos

  • Comments

Homeowner comments

  • Within this inspection it may prove beneficial to capture the needs/requirements of the homeowner, please provide any comments, observations, feedback, wishes that will assist this report.

Conclusion and recomendations

  • The summary on completion will produce a report with photos as evidence, it may offer suggestion and importantly a way forward for all involved. Our comments and observations are deemed to be correct at the time of inspection and executed on the details provided.

    We are under NO obligation to share this report unless an agreement is in place, in addition, this report can only be shared with the express permission of Network VEKA.

  • Overview of the inspection

  • Additional or supporting photos

Signatures

  • I/we agree to the contents detailed in this report and therefore sign to accept both the details in this report are correct and the information within this report remains the property of Independent Network and may only shared with the express permission of IN.

  • IF APPLICABLE: I/we agree that the works described are an accurate account of items required to complete the installation/works and I understand that if there is a balance payable it will be paid on completion of this report as per the terms and conditions of the contract. It has been made clear that if there are any further works identified after the date of this report these works will be captured, documented separately and as per the consumer rights act I am entitled with withhold a payment representative of the outstanding work not the full balance.

  • Paul Stevens

  • Customer

Thank you

  • Statement of compliance

  • This report includes all matters relevant to the issues on which my expertise is given. I have given details in this report of any matters which might affect the validity of this report.

  • Statement of truth

  • I confirm that I have made clear which facts and matters referred to in this report are within my own knowledge and which are not. Those that are within my own knowledge I confirm to be true. The opinions I have expressed represent my true and complete professional opinions on the matters to which they refer.

  • Statement of conflicts

  • I confirm that I have no conflict of interest of any kind, other than any which I have already set out in this report. I do not consider that any interest which I have disclosed affects my suitability to give expert evidence on any issue relevant to this installation.

  • We at Independent Network would like to thank you for your cooperation whilst completing this report.

  • Paul Stevens
    Technical Support Manager
    Mob: 07818 251496
    Email: pstevens@inveka.co.uk
    Network VEKA Ltd, Farrington Road, Rossendale Road Industrial Estate, Burnley, Lancashire, BB11 5DB
    Company Registration No: 4029350 VAT Registration No. 677 3182 08

    IN-25-YEARS.png
The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.