Title Page

  • Conducted on

  • Prepared by

  • Are the equipment Pre-Trip check-offs completed and signed by the operator using the equipment?

  • Are all ingots stacked according to the SOP?

  • Are the boards placed correctly between each ingot in the stack?

  • Is the main/bottom piece of wood a 10x10 tie?

  • Do the ties on the bottom of the stack protrude from the bottom ingot?

  • Are the ties in each row placed correctly?

  • Are the labels on each ingot clearly visible and identifiable?

  • Are the ingots placed in the correct alloy location?

  • Are the roadways suitable for traveling and/or movement?

  • Are all dumpsters emptied?

  • Are the boards in the racks banded and/or stacked neatly?

  • Are the boards in the correct rack locations?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.