Title Page
-
Conducted on
-
Prepared by
-
Location
1. Material Section
-
Activity Description
-
Method Reference
-
Inspection/Test Frequency
-
Accpetance Criteria
-
Contractor Sign Off
-
Client Sign Off
2. Construction Overview
-
Activity Description
-
Method Reference
-
Inspection/Test Frequency
-
Accpetance Criteria
-
Contractor Sign Off
-
Client Sign Off
3. Testing Summary
-
Activity Description
-
Method Reference
-
Inspection/Test Frequency
-
Accpetance Criteria
-
Contractor Sign Off
-
Client Sign Off
4. Installation Summary
-
Activity Description
-
Method Reference
-
Inspection/Test Frequency
-
Accpetance Criteria
-
Contractor Sign Off
-
Client Sign Off
5. Design Tolerances
-
Activity Description
-
Method Reference
-
Inspection/Test Frequency
-
Accpetance Criteria
-
Contractor Sign Off
-
Client Sign Off
6. Traffic Considerations
-
Activity Description
-
Method Reference
-
Inspection/Test Frequency
-
Accpetance Criteria
-
Contractor Sign Off
-
Client Sign Off
7. Survey Considerations
-
Activity Description
-
Method Reference
-
Inspection/Test Frequency
-
Accpetance Criteria
-
Contractor Sign Off
-
Client Sign Off
8. Inspection Requirements
-
Activity Description
-
Method Reference
-
Inspection/Test Frequency
-
Accpetance Criteria
-
Contractor Sign Off
-
Client Sign Off
Completion
-
Contractor Sign Off
Client Review
-
Are all NCR's closed out
-
Are all relevant signatures completed?
-
Have all lots had the required number of tests?
-
All inspections completed
-
Client Sign Off