Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Untitled Page
-
Drayton Beaumont Services Ltd
-
Date:
-
Description:
-
Project Name:
Discipline: Ductwork
-
Location/ Building:
-
Level/Floor:
ACTIVITY
-
Ensure line and level is correct (including brackets)
-
Ensure appropriate level above ceiling level is maintained
-
Ensure all access/maintenance doors (including access panels for cleaning) are installed free of obstruction
-
Ensure all fire/smoke dampers are accessible and open
-
Ensure all variable control dampers are accessible and open
-
Ensure all slip/flange joints are made and sealed correctly
-
(including clamps)
-
Remarks:
-
Reviewed By
SIGN
-
DATE
-
Drayton Beaumont Services Ltd