Title Page
-
Project Number
-
Date
-
Project Name
-
Discipline
-
Drawing Number
-
Revision
-
Prepared by
-
Location/ Building
-
Level/Floor
-
Area
ACTIVITY
-
1 Ensure radiators are positioned as per drawing requirements.
-
2 Ensure radiators are correctly aligned.
-
3 Ensure associated pipework is correctly aligned and draw off cocks fitted, where required.
-
4 Ensure all pipework brackets are level and secure.
-
5 Ensure thermostatic heads are fitted correctly and operational.
-
6 Ensure there is no apparent sign of damage.
Remarks
-
undefined
Sign Off
-
Name and Signature
-
Name and Signature