Title Page
-
Conducted on
-
Prepared by
-
Location
JanDec
-
Site name
-
Date
-
1.1 All Actions Completed
-
1.2 All Sub con checked on PSL
-
2.1 Final Check form complete
-
2.2 PD review form completed
-
2.3 Day 1 site set up form complete (& Emailed)
-
2.4 Site Manager's Guided Signed & Emailed
-
2.5 Asbestos survey issued to sigma & site
-
2.6 F10 displayed ( if required )
-
2.7 HSE Law Poster displayed
-
2.8 Sigma insurance displayed
-
2.9 Suitable CP Plan on site
-
2.10 Relevant & Suitable site plan visible on site
-
2.11 Relevant & suitable traffic Management plan in place ( where required )
-
2.12 Site managers Certs on site
-
2.13 Site inductions being carried out & recorded
-
2.14 Relevant & suitable RAMS on site ( Not hot works )
-
2.15 RAMS signed by relevant operatives
-
2.16 Rams reviewed
-
2.17 Coshh File on site ( Small works )
-
2.18 Relevant Coshh Assessments on file and register filled in
-
2.19 Operatives Asbestos Certs on site ( paper )
-
2.20 Operatives Ffit Certs on site ( where relevant )
-
2.21 All operatives competence varified ( CSCS/ECS )
-
2.22 Pre Start meeting notes on site ( Asda only )
-
3.1 General Site PPE being worn ( 4 Point )
-
3.2 Task specific PPE being used as per RAMS
-
3.3 Is the site generally tidy
-
3.4 All ( Non COSHH ) Mats stacked & stored safely
-
3.5 All COSHH materials stored in Container/cage ( where applicable )
-
3.6 Adequate general site signage
-
3.7 Site Perimeter secure
-
4.1 first Aider on site
-
4.2 Contractors first aid box on site
-
4.3 Is the first aid box fully stocked
-
4.4 Sufficient Contractors eye wash stations on site
-
4.5 Are the eye wash bottles sealed
-
4.6 Are the welfare facilities adequate & Clean
-
4.7 Sufficient drinking water available ( External works Only )
-
5.1 Relevant & Suitable fire evacuation plan on site
-
5.2 Suitable Contractor FFE in place on site
-
5.3 Backup fire alarm in place
-
5.4 Can all operatives be accounted for
-
5.5 No Smoking rules clear and adhered to
-
5.6 All Fire Exists clearly signed
-
6.1 Access & Egress easy & safe
-
7.1 Suitable excavation barriers / edge protection in place
-
7.2 Safe Access & egress from excavation
-
7.3 Buried services checked & marked
-
7.4 Permit to excavate in place
-
8.1 Fixed scaffold erected safely including access ladders
-
8.2 TG:20 design in place
-
8.3 Scaff tags in place
-
9.1 Mobile toweres erected correctlyLadders & height
-
9.2 Toe guards & Hand rails correctly installed
-
9.3 PASMA Competency checked
-
9.4 Ladders, steps & mobile scaffold in safe order
-
9.5 Ladder permit in place
-
9.6 Ladder permit complied with
-
10.1 All site electrical equipment tested and in good order
-
10.2 Lighting & power
-
10.3 Site cabling Safety
-
10.4 LOTO & isolation carried out where required
-
11.1 Suitable risk assessment in place for Hot Works
-
11.2 Hot works permit in place
-
11.3 HWP being complied with
-
11.4 Previous HWP recorded
-
11.5 Any gas bottles/hoses/pipe work in good order
-
11.6 Fuel / gas stored safely
-
12.1 Pre use checks & paperwork where required
-
12.2 Plant operatives trained
-
12.3 Statutary Hire paperwork checked
-
13.1 Precautions in place to reduce dust
-
13.2 Precautions in place to protect against dust
-
13.3 Precautions in place to reduce noise exposure
-
13.4 Precautions in place to protect against noise
-
13.5 Precautions in place to protect against vibration
-
14.1 Monitoring PPE
-
14.2 Monitoring discipline
-
14.3 Monitoring Welfare
-
14.4 Monitoring ladders & Scaffold( Use & Condition 0
-
14.5 Monitoring COSHH
-
15.1 Permits being issued (Not Hot works)
-
15.2 Permits register being used
-
15.3 Permits being complied with
-
16.1 Signing in
-
16.2 Signing out
-
17.1 TBTs being carried out
-
17.2 TBT's signed
-
18.1 Accidents recorded
-
18.2 Near misses recorded
-
18.3 H&S Man/Team informedAccidents