Title Page

  • Conducted on

  • Prepared by

  • Location

JanDec

  • Site name

  • Date

  • 1.1 All Actions Completed

  • 1.2 All Sub con checked on PSL

  • 2.1 Final Check form complete

  • 2.2 PD review form completed

  • 2.3 Day 1 site set up form complete (& Emailed)

  • 2.4 Site Manager's Guided Signed & Emailed

  • 2.5 Asbestos survey issued to sigma & site

  • 2.6 F10 displayed ( if required )

  • 2.7 HSE Law Poster displayed

  • 2.8 Sigma insurance displayed

  • 2.9 Suitable CP Plan on site

  • 2.10 Relevant & Suitable site plan visible on site

  • 2.11 Relevant & suitable traffic Management plan in place ( where required )

  • 2.12 Site managers Certs on site

  • 2.13 Site inductions being carried out & recorded

  • 2.14 Relevant & suitable RAMS on site ( Not hot works )

  • 2.15 RAMS signed by relevant operatives

  • 2.16 Rams reviewed

  • 2.17 Coshh File on site ( Small works )

  • 2.18 Relevant Coshh Assessments on file and register filled in

  • 2.19 Operatives Asbestos Certs on site ( paper )

  • 2.20 Operatives Ffit Certs on site ( where relevant )

  • 2.21 All operatives competence varified ( CSCS/ECS )

  • 2.22 Pre Start meeting notes on site ( Asda only )

  • 3.1 General Site PPE being worn ( 4 Point )

  • 3.2 Task specific PPE being used as per RAMS

  • 3.3 Is the site generally tidy

  • 3.4 All ( Non COSHH ) Mats stacked & stored safely

  • 3.5 All COSHH materials stored in Container/cage ( where applicable )

  • 3.6 Adequate general site signage

  • 3.7 Site Perimeter secure

  • 4.1 first Aider on site

  • 4.2 Contractors first aid box on site

  • 4.3 Is the first aid box fully stocked

  • 4.4 Sufficient Contractors eye wash stations on site

  • 4.5 Are the eye wash bottles sealed

  • 4.6 Are the welfare facilities adequate & Clean

  • 4.7 Sufficient drinking water available ( External works Only )

  • 5.1 Relevant & Suitable fire evacuation plan on site

  • 5.2 Suitable Contractor FFE in place on site

  • 5.3 Backup fire alarm in place

  • 5.4 Can all operatives be accounted for

  • 5.5 No Smoking rules clear and adhered to

  • 5.6 All Fire Exists clearly signed

  • 6.1 Access & Egress easy & safe

  • 7.1 Suitable excavation barriers / edge protection in place

  • 7.2 Safe Access & egress from excavation

  • 7.3 Buried services checked & marked

  • 7.4 Permit to excavate in place

  • 8.1 Fixed scaffold erected safely including access ladders

  • 8.2 TG:20 design in place

  • 8.3 Scaff tags in place

  • 9.1 Mobile toweres erected correctlyLadders & height

  • 9.2 Toe guards & Hand rails correctly installed

  • 9.3 PASMA Competency checked

  • 9.4 Ladders, steps & mobile scaffold in safe order

  • 9.5 Ladder permit in place

  • 9.6 Ladder permit complied with

  • 10.1 All site electrical equipment tested and in good order

  • 10.2 Lighting & power

  • 10.3 Site cabling Safety

  • 10.4 LOTO & isolation carried out where required

  • 11.1 Suitable risk assessment in place for Hot Works

  • 11.2 Hot works permit in place

  • 11.3 HWP being complied with

  • 11.4 Previous HWP recorded

  • 11.5 Any gas bottles/hoses/pipe work in good order

  • 11.6 Fuel / gas stored safely

  • 12.1 Pre use checks & paperwork where required

  • 12.2 Plant operatives trained

  • 12.3 Statutary Hire paperwork checked

  • 13.1 Precautions in place to reduce dust

  • 13.2 Precautions in place to protect against dust

  • 13.3 Precautions in place to reduce noise exposure

  • 13.4 Precautions in place to protect against noise

  • 13.5 Precautions in place to protect against vibration

  • 14.1 Monitoring PPE

  • 14.2 Monitoring discipline

  • 14.3 Monitoring Welfare

  • 14.4 Monitoring ladders & Scaffold( Use & Condition 0

  • 14.5 Monitoring COSHH

  • 15.1 Permits being issued (Not Hot works)

  • 15.2 Permits register being used

  • 15.3 Permits being complied with

  • 16.1 Signing in

  • 16.2 Signing out

  • 17.1 TBTs being carried out

  • 17.2 TBT's signed

  • 18.1 Accidents recorded

  • 18.2 Near misses recorded

  • 18.3 H&S Man/Team informedAccidents

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.