Title Page
-
Conducted on
-
Prepared by
-
Location
-
Select date
-
Works Package
-
Line Number
-
Pipe Diameter
-
Flow Rate
- Slow
- Average
- High
-
U/S Manhole Number
-
Gas Levels
- High
- Normal
- Very High
- Not Applicable
-
D/S Manhole Number
-
Gas Levels
- High
- Normal
- Very High
- Not Applicable
-
Reason for Civil Works
- Buried Manhole
- Damaged/Undersized Manhole
- Displaced Junction
- Dropper
- End of Line IS
- Failed Interfit
- Intermediate IS
- Mains Spot Repair
- Pit rebuild/demolition
- Un-interfitable connection
- Other
-
Details of Dig - please add notes and photos of site.
-
Site Images
-
Has the dig site been clearly and accurately marked?
- Yes
- No
- Not Applicable
-
How was the dig marked?
- Camera Reel
- Sonde
- Trundle Wheel
- Other
-
Who marked the dig?
-
Site images
-
Excavation Address
-
Property Resident Contact Details
-
Excavation Location
- Roadway
- Footpath
- Laneway
- Naturestrip
- Driveway
- Front Yard
- Back Yard
- Park / Reserve
- Other
-
Surface Material
- Asphalt
- Bluestone
- Concrete
- Lawn/Garden
- Paving/Tiles
- Other
-
Is reinstatement of concrete or asphalt required?
- Yes
- No
- Not Applicable
-
Excavator Access
-
Known Obstructions
- None
- Buildings
- Traffic
- Walls
- Trees
- Power/Phone Poles
- Other
-
Is Traffic Management required?
- Yes
- No
- Not Applicable
-
Dig Depth
-
Dig Length
-
U/S Manhole Depth
-
D/S Manhole Depth
-
Has the resident been notified of intended works?
- Yes
- No
- Not Applicable
-
Has a Home Plan been completed with the Resident?
- Yes
- No
- Not Applicable
-
General Comments
Sample Summary and Signoff
-
Name and signature of inspector