Information
-
Operative Name
-
Work order Number
-
Reason for Procedure Compliance Check
-
Procedure Compliance check Type
-
Location
-
Conducted on
-
Prepared by
Check
Electrical
-
Preliminary electrical checks carried out correctly.
-
Demonstrated Safe Isolation
-
Does the appliance have the correctly rated fuse.
-
Satisfactory distance from electrical wire/cables and gas pipework.
Gas meter, ECV, and gas installation
-
Meter installation satisfactory.
-
Did engineer check Correct labels fitted.
-
Did engineer check Correct equipotential bonding and pisitioning (Gas meter).
-
Did engineer check if Satisfactory gas pipework installation and sleeving.
Testing
-
Satisfactory full tightness test.
-
Satisfactory local tightness test.
-
Did engineer check Satisfactory meter regulator working pressure.
Operational Checks And Inspections
-
CO/CO2 Min/Max<br>PPM<br>Ratio
-
Did engineer check Flue route, integrity and termination.
-
Did engineer check Working pressure P1
-
Did engineer check Operation of safety device.
-
Did engineer check Case seal (Room sealed appliances)
-
Did engineer check Burner Condition
-
Front plate seal checked/replaced
-
Checked/Cleaned heat exchanger
-
Did engineer check Gas rate.
-
Water flow rates and temperature checked and set
-
Scale Protection checked by engineer<br>
-
C/H System water quality checked
-
C/H System filter fitted checked by engineer
-
Did engineer check Compliant with manufacturer's instructions.
-
Correct operations of heating controls checked.
Benchmark completed & Service paperwork checked?
-
Did engineer check that benchmark book completed
-
Gas safety record completed for service correctly and issued to customer.
-
Was a warning notices correctly issued and applied.
-
Was a warning sticker applied to the appliance
Health and Safety
-
Safe working practices applied.
-
Engineer Has up to date copy of the Gas industry unsafe situations procedure.
-
Engineer qualified for work carried out.
-
Engineer wearing issued uniform.
-
Safety footwear being worn.
-
Required PPE being worn.
-
PPE in good condition.
-
First aid kit available and stocked.
-
Fire extinguisher available and in date.
Customer satisfaction
-
Engineer possess and uses gas safe ID card.
-
Did the engineer phone ahead of planned visit.
-
Clean, tidy and protected working area/s.
-
Customer satisfied with quality of work
-
Appointed times agreed and met.
-
Did the Engineer explain to the customer what was done/needs to be done.
-
Engineers appearance
Safe completion
-
Has the appliance/installation been left safe for use.
General comments/observations- Actions to be taken.
-
undefined
Inspection carried out by
-
Add signature
-
Select date
Operative comments
-
This is a true reflection of my work.
-
I agree to abide by the actions mentioned above.
Operative
-
Add signature
-
Select date