Title Page
-
Client/site
-
Conducted on
-
Prepared by
Report summary and overview
-
Select date
-
Add location
-
Overview pictures of job site.
-
Summarize the work being performed.
-
Inspection report summary
Safety plans and records
-
Hazcom and SDS sheets available?
-
Spot check job site for chemicals not in inventory
-
Check containers for proper GHS labels
-
Fall protection plan
-
Steel erection safety plan
-
First aid kit available
-
Weekly toolbox talk training
-
Fire hazards identified
-
Are fueling areas free from combustible materials
PPE
-
Have employees been trained on how to correctly use PPE
-
Is PPE being inspected prior to use
-
Is the PPE adequate for the work being performed
-
Hard hats worn at all times
-
Proper boots and gloves as needed
-
Hi-visibility vests or clothing
-
Safety glasses
-
Respirators, N95 masks and ear plugs as needed
Silica
-
Have silica specific tool box talks occurred and have sign in sheets been completed
-
Prework meeting held to minimize exposure among all trades
-
Do employees have silica training hard hat decals
-
Are wet methods to include sweeping compound being used
-
Are water integrated tools in satisfactory condition
-
Have the number of employees working in or around the area been limited to only those needed
-
Have employees from other trades entered the work area
-
Do these individuals have proper PPE
-
If not, was PPE issued to them
Fall protection
-
Is there a rescue plan
-
Harnesses and lanyards in satisfactory condition
-
Personal trained in proper fall protection procedures
-
Anchorage points acceptable
-
Guard rails and cables installed correctly and compliant with the standard
-
Open holes covered and marked as such
Welding and cutting
-
Shields being worn
-
Bottles upright and secured
-
Fire extinguishers readily accessible
-
Fire watch
Equipment
-
Are fire extinguishers present, charged, and tagged within date
-
Do operators have current proof of training
-
Equipment operating properly
-
Tires, brakes, hydraulics and safety features working and tested prior to usage
-
Backup alarms operating
-
If rental equipment, has the rental service reviewed proper operation procedures
Handheld equipment
-
Are power tools being used properly
-
Are machine guards in place, unaltered
Electrical
-
Extension cords free of damage
-
Electric tools with cords free of damage
-
Are GFCIs being used
-
Lock out tag out implemented
Personnel platforms
-
Is there a rescue plan
-
Do operators have proof of current training
-
Scissors lift
-
Boom lift
-
Fork truck
-
Lifts being operated correctly
-
Fall protection being used
Monitoring
-
Decibel level monitoring
-
Silica monitoring
Housekeeping
-
Is the general work area clean and free of debris
-
Are walking working surfaces clean and free of debris
-
Are tobacco, food and drink policies in place and being followed
-
Are there adequate personal facilities onsite for employee use
JSA
-
Was a closing meeting held
-
Summary of meeting
-
Any safety concerns identified among employees, foreman superintendent or the general contractor
-
Details of concerns
-
For any corrective actions identified was a implementation timeline discussed
-
Items needing correction
-
Timeline
-
Is a follow up plan in place
-
Follow up plan
-
Add signature