Handover Report
Internal/External Doors
-
Are all internal & external doors, jambs, architraves & handles installed?
-
Are all gaps around door frames clearing jambs, finished floor & within tolerance?
-
Are all internal door handles installed correctly & functioning?
-
Are all striker plates installed?
-
Do doors sit tight to the door stop without any rattle when engaged in closed position?
-
Is cavity sliding doors installed correctly & sliding without any problem?
-
Are cavity sliding door roller clips locked into door hooks?
Skirting & Architrave
-
Are all window & door casings installed to specification?
-
Is all skirting board installed around all floor areas to specification?
-
Do any window or door frames sit past the finished wall level?
-
If so, have these been planed/sanded back to suit?
Lock Up/Hand Over
-
Has dwelling been locked up (garage door, entrance door & laundry door if applicable)
-
Have keys been handed over to site supervisor/builder
-
Has work areas been cleaned prior to work being completed?
-
Is there anything else that is missing, requires further work or requires a return trip to complete? Describe here
Images
-
Completed Entrance Door
-
Completed Garage Internal Door
-
Completed Laundry/External Door (if applicable)
-
Upload video of cavity sliding door functioning correctly