标题页

  • eSMS audit reference

  • Audit Title

  • Vendor Name

  • Vendor Ref

  • Conducted on

  • Prepared by

  • Location
  • Personnel

General Info

eSMS or PLM Info

  • Qual # (SQ-xxxxxx) & associated qualifications

  • Scope

  • Qualified drawing number and revision

  • Previous audit on same subject #:

  • ISO Certification

DART/PLM/TC5 Info

  • Latest Released Drawing # and Rev

  • Part # and Rev

  • Part Description

  • GE Applicable Documents

AUDIT DATA

  • PO # audited

  • Drawing # and rev (called on PO):

  • Part # and rev (called on PO):

  • Other documents called on PO :

  • Qual # called on PO:

MPP DATA

  • Vendor Applicable Internal Procedures

  • Vendor Tooling List called on MPP

  • Vendor Control tools called on MPP

  • Sub-Suppliers

OTHER

  • Volume supplied last year

  • Forecasted volume this year

  • SDR activity last year/current year (Vendor responsibility)

  • NCR activity last year/current year

  • Fulfillment performance

  • Check if no lack of production for more than 18 months

PRODUCT AUDIT / DOCUMENTATION

PO ANALYSIS

  • Is drawing revision called on PO same as latest GE released drawing ?

  • Is part revision called on PO, MPP and latest GE revision the same ?

  • Is qual # called on PO the applicable one ?

  • Does the supplier possess all documents called in PO with their latest revisions ?

DOCUMENTATION

  • Is there a qualification for this ref x vendor in eSMS/PLM?

  • Are there any FPCRs on this qual ?

  • Does the supplier has a copy of the 623A form available in house ?

  • Is the MPP rev on e-SMS/PLM same as the one applicable at vendor ?

  • Are all drawing/specifications evolutions (since qual was closed) applied by vendor?

  • If yes, was (were) the evolution(s) documented with the right process?

  • Does the supplier has copies of all latest GE specifications?

  • Are all internal procedures still valid and used? Do they have same revision n° as during qual ?

  • Are data cards/parameter sheets still valid and applied ?

  • Are there any evidences of periodic layouts of the tools ? What periods were defined and how ?

  • Is the maintenance activity performed on each tooling scheduled and recorded when achieved?

  • Is documentation of proprietary process documented in a revision controlled procedure ?

  • Are those documents referenced in MPP by document ID and revision number ?

  • Are frozen process parameters clearly identified on MPP ?

PRODUCT QUESTIONNAIRE

DIMENSIONAL/INVESTMENT CASTING + DATUM MACHINING

  • Are datum planes established as per drawing requirements ?

  • Are features checked to the drawing datums ?

  • Are all CTQs checked and recorded on all parts ?

  • Are all other features within drawing requirements ?

  • Are all non-conforming features related to an SDR ?

  • Where EDM is used (ex: to remove gates, lugs) and casting delivered with the as- EDM'd surface, are machining operations compliant with GE spec P3D-AG1 ? (metallurgical evaluation)

DIMENSIONAL/ COOLING HOLES

  • Are diameters of CH within drawing requirements ?

  • Are cooling holes true position within drawing requirements ?

  • Are all cooling holes completely drilled (completely open)?

  • Is part compliant with visual inspection requirements ?

  • Is number of holes compliant with drawing requirements ?

  • Is taper size within requirements ?

  • Is scarfing within specified limits ?

  • Is washout within specified limits ?

  • Are all other features compliant with drawing requirements ?

  • Are all CTQs checked and recorded on all parts ?

  • Are all non-conforming features related to an SDR ?

DIMENSIONAL/SIDEWALLS, FACES, SEAL SLOTS

  • Are surfaces profile within drawing requirements ?

  • Are surfaces location within drawing requirements ?

  • Is surface quality within dwg requirement (roughness,…) ?

  • Is part compliant with visual inspection requirements ?

  • Are all other features compliant with drawing requirements ?

  • Are all CTQs checked and recorded on all parts ?

  • Are all non-conforming features related to an SDR ?

MARKING - PRESERVATION - HANDLING

  • Marking: is the height of characters conforming?

  • Does the marking comply with dwg requirements ? (composition, location)

  • Are parts identified per P23A-AG2 ?

  • Are the parts clean ? (free from oil, foreign material, metal chips, cutting fluids, detergent,…)

  • Are parts handled with clean hands or gloves ?

  • Are handling conditions acceptable ?

  • Is cleanliness of part preserved during handling ?

NDT INSPECTION

  • Are NDT requirements, frequencies still applicable ? (FPI, X-ray, US,…)

  • Is vendor FPI line qualified by GE ?

  • Is vendor X-ray process qualified by GE ?

  • Is vendor part X-ray tech sheet approved by GE ?

  • Is Ultra Sonic inspection process approved by GE ?

  • Is part visually acceptable ? (no porosity, crack,…)

CMM INSPECTION

  • Are datum surfaces established as per drawing requirements ?

  • Is the CMM program same as the qualified one ? Evaluate CMM program evolution since qualification.

  • Are all CMM features checked to the drawing defined datums ?

  • Are CMM fixtures regularly checked (dimensional layout + gage R&R) for accuracy?

  • Is CMM program accurate for measured items ? Radii,…

  • Is the dimensional report limits compliant with latest released drawing ?

AIRFLOW TESTING

  • Is part flowed as per MPP ?

  • Is the airflow program same as the qualified one ? Evaluate program evolutions since qualification

  • Is airflow within drawing requirements ?

  • Is leakage checked during test ?

  • Is airflow stand regularly checked (for potential leakage) ?

  • Is a master piece available for stand daily evaluation ?

  • Is the airflow report compliant with drawing requirements ?

FINAL RELEASE

  • Is there a certificate of conformity for all parts ?

  • Is the packaging compliant with GE quality requirements ?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.