标题页
-
eSMS audit reference
-
Audit Title
-
Vendor Name
-
Vendor Ref
-
Conducted on
-
Prepared by
-
Location
-
Personnel
General Info
eSMS or PLM Info
-
Qual # (SQ-xxxxxx) & associated qualifications
-
Scope
-
Qualified drawing number and revision
-
Previous audit on same subject #:
-
ISO Certification
DART/PLM/TC5 Info
-
Latest Released Drawing # and Rev
-
Part # and Rev
-
Part Description
-
GE Applicable Documents
AUDIT DATA
-
PO # audited
-
Drawing # and rev (called on PO):
-
Part # and rev (called on PO):
-
Other documents called on PO :
-
Qual # called on PO:
MPP DATA
-
Vendor Applicable Internal Procedures
-
Vendor Tooling List called on MPP
-
Vendor Control tools called on MPP
-
Sub-Suppliers
OTHER
-
Volume supplied last year
-
Forecasted volume this year
-
SDR activity last year/current year (Vendor responsibility)
-
NCR activity last year/current year
-
Fulfillment performance
-
Check if no lack of production for more than 18 months
PRODUCT AUDIT / DOCUMENTATION
PO ANALYSIS
-
Is drawing revision called on PO same as latest GE released drawing ?
-
Is part revision called on PO, MPP and latest GE revision the same ?
-
Is qual # called on PO the applicable one ?
-
Does the supplier possess all documents called in PO with their latest revisions ?
DOCUMENTATION
-
Is there a qualification for this ref x vendor in eSMS/PLM?
-
Are there any FPCRs on this qual ?
-
Does the supplier has a copy of the 623A form available in house ?
-
Is the MPP rev on e-SMS/PLM same as the one applicable at vendor ?
-
Are all drawing/specifications evolutions (since qual was closed) applied by vendor?
-
If yes, was (were) the evolution(s) documented with the right process?
-
Does the supplier has copies of all latest GE specifications?
-
Are all internal procedures still valid and used? Do they have same revision n° as during qual ?
-
Are data cards/parameter sheets still valid and applied ?
-
Are there any evidences of periodic layouts of the tools ? What periods were defined and how ?
-
Is the maintenance activity performed on each tooling scheduled and recorded when achieved?
-
Is documentation of proprietary process documented in a revision controlled procedure ?
-
Are those documents referenced in MPP by document ID and revision number ?
-
Are frozen process parameters clearly identified on MPP ?
PRODUCT QUESTIONNAIRE
DIMENSIONAL/INVESTMENT CASTING + DATUM MACHINING
-
Are datum planes established as per drawing requirements ?
-
Are features checked to the drawing datums ?
-
Are all CTQs checked and recorded on all parts ?
-
Are all other features within drawing requirements ?
-
Are all non-conforming features related to an SDR ?
-
Where EDM is used (ex: to remove gates, lugs) and casting delivered with the as- EDM'd surface, are machining operations compliant with GE spec P3D-AG1 ? (metallurgical evaluation)
DIMENSIONAL/ COOLING HOLES
-
Are diameters of CH within drawing requirements ?
-
Are cooling holes true position within drawing requirements ?
-
Are all cooling holes completely drilled (completely open)?
-
Is part compliant with visual inspection requirements ?
-
Is number of holes compliant with drawing requirements ?
-
Is taper size within requirements ?
-
Is scarfing within specified limits ?
-
Is washout within specified limits ?
-
Are all other features compliant with drawing requirements ?
-
Are all CTQs checked and recorded on all parts ?
-
Are all non-conforming features related to an SDR ?
DIMENSIONAL/SIDEWALLS, FACES, SEAL SLOTS
-
Are surfaces profile within drawing requirements ?
-
Are surfaces location within drawing requirements ?
-
Is surface quality within dwg requirement (roughness,…) ?
-
Is part compliant with visual inspection requirements ?
-
Are all other features compliant with drawing requirements ?
-
Are all CTQs checked and recorded on all parts ?
-
Are all non-conforming features related to an SDR ?
MARKING - PRESERVATION - HANDLING
-
Marking: is the height of characters conforming?
-
Does the marking comply with dwg requirements ? (composition, location)
-
Are parts identified per P23A-AG2 ?
-
Are the parts clean ? (free from oil, foreign material, metal chips, cutting fluids, detergent,…)
-
Are parts handled with clean hands or gloves ?
-
Are handling conditions acceptable ?
-
Is cleanliness of part preserved during handling ?
NDT INSPECTION
-
Are NDT requirements, frequencies still applicable ? (FPI, X-ray, US,…)
-
Is vendor FPI line qualified by GE ?
-
Is vendor X-ray process qualified by GE ?
-
Is vendor part X-ray tech sheet approved by GE ?
-
Is Ultra Sonic inspection process approved by GE ?
-
Is part visually acceptable ? (no porosity, crack,…)
CMM INSPECTION
-
Are datum surfaces established as per drawing requirements ?
-
Is the CMM program same as the qualified one ? Evaluate CMM program evolution since qualification.
-
Are all CMM features checked to the drawing defined datums ?
-
Are CMM fixtures regularly checked (dimensional layout + gage R&R) for accuracy?
-
Is CMM program accurate for measured items ? Radii,…
-
Is the dimensional report limits compliant with latest released drawing ?
AIRFLOW TESTING
-
Is part flowed as per MPP ?
-
Is the airflow program same as the qualified one ? Evaluate program evolutions since qualification
-
Is airflow within drawing requirements ?
-
Is leakage checked during test ?
-
Is airflow stand regularly checked (for potential leakage) ?
-
Is a master piece available for stand daily evaluation ?
-
Is the airflow report compliant with drawing requirements ?
FINAL RELEASE
-
Is there a certificate of conformity for all parts ?
-
Is the packaging compliant with GE quality requirements ?