Title Page
-
Site conducted
-
DATE AUDIT CONDUCTED
-
FOR LOCAL #
-
WHAT TYPE OF AUDIT CONDUCTED
-
AUDIOR'S NAME
-
Location
ACREDITED TESTING FACILITY STAFF
-
PERSON INTERVIEWED
-
TRAINING COORDINATOR:
-
PHONE #:
-
EMAIL ADDRESS
I. STAFF FILES
-
IS THERE A FILE LABLED FOR THE FACILITY REPRESENITIVE?
- YES
- NO
-
DOES THE FILE INCLUE THE FOLLOWING ( CHECK ALL THAT APPLY)
-
-
DOES THE FACILITY REPRESENTIVE HAVE A MINIMUM OF FIVE YEARS TECHNICAL EXPERICANCE IN INSPECTION AND WELD TESTING?
-
IS THERE A FILE LABLED FOR QUALITY ASSUREANCE MANAGER
- YES
- NO
-
THE FILE MUST CONTAIN THE FOLLOWING.
-
IS THERE A FILE LABLED FOR EACH TEST SUPERVISOR?
-
THE FILE MUST CONTAIN THE FOLLOWING
-
IS THERE A FILE LABLED FOR EACH WELDING INSTRUCTOR?
-
THE FILES MUST INCLUDE THE FOLLOWING.
-
HOW MANY WELDING INSTRUCTORS ARE EMPLOYED?
-
LIST NAMES, MEMBER NUMBERS (CWI CERTIFICATION NUMBER IF APPLICABLE)
-
DOES THE ACCRETITED TEST FACILITY EMPLOY NDE PERSONEL?
-
LIST NAMES, MEMBER NUMBERS AND CERTIFICATION AGENCY AND NUMBER
-
ARE NDE PERSONNEL QUALIFIED TO ASNT RECOMMENDED PRACTIC SNT-TC-1A?
II. WELDER FILES
-
IS A SEPARATE FILE MAINTAINED FOR EACH WELDER?
-
DOES THE FILE CONTAIN
III. MATERIAL FILES
-
IS A FILE MAINTAINED FOR TEST COUPON MATERIALS?
-
DOES THE FILE CONTAIN THE FOLLOWING
-
IS A FILE MAINTAINED ON ELECTRODES USED FOR TESTING?
-
DOES THE FILE CONTAIN THE FOLLOWING
-
LOG FOR TEST ELECTRODES RECEIVED
IV. CONTRACT SERVICES
-
ARE NDE SERVICES CONTRACTED OUT?
-
IS THERE A STATEMENT OF CONTRACTOR QUALIFICATION ON FILE
-
IS THE WELDER IDENTIFICATION CODE (TEST # AND/OR LETTERS) PLACED ON NDE SPECIMENS?
-
ARE CONTRACTED NDE WELD TEST REPORTS MAINTAINED IN THE WELDERS FILE?
-
ARE CONTRACT NDE PERSONNEL QUALIFIED TO ASNT SNT‐TC‐1A?
-
ARE NDE WELD SPECIMENS RETRIEVED AND STORED IN A SECURE AREA FOR A MINIMUM OF SIX MONTH?
V. OPERATIONS
-
IS THE WELDER ASSIGNED A UNIQUE TEST IDENTIFICATION CODE(TEST#, AND /OR LETTES) FOR EACH TEST?
-
IS A LOG KEPT FOR ALL TEST ID CODES ISSUED?
-
IS THE TEST IDENTIFICATION CODE (TEST # AND/OR LETTERS) AND POSTION RECORDED ONTEST
-
ARE THE TEST MATERIAL AND ELECTRODE IDENTIFICATION ID CODES RECORDED ON THE TEST FACILITY WORK SHEET?
-
ARE WRITTEN INSTRUCTIONS AND SKETCHES AVAILABLE FOR THE WELDER TO USE IN THE FITTING UP THE TEST ASSEMBLT?
-
IS A WELDING PROCEDURE MADE AVAILABLE TO THE WELDER PRIOR TO FIT UP AND WELDING?
-
IS THE FIT UP INSPECTED?
-
IS THE COUPON MARKED WITH THE WELDER ID CODE (TEST # AND/OR LETTERS) AND POSTION IN THE EXACT LOCATION OF THE TEST SPECIMENS PRIOR TO WELDING?
-
IS POSITIONING OF THE COUPON VERIFIED PRIOR TO WELDING?
-
IS THE WELDER NOTIFIED THAT REPOSITIONING OF THE WELD COUPON WITHOUT APPROVAL OF THE TEST SUPERVISOR WILL INVALIDATE THE TEST?
-
IF NECESSARY, IS REPOSITIONING VERIFIED?
-
IS THE ROOT PASS VISUALLY INSPECTED BY THE TEST SUPERVISOR PRIOR TO THE NEXT WELDING OPERATION?
-
IS THE FINISHED WELD VISUALLY INSPECTED BY THE TEST SUPERVISOR PRIOR TO REMOVAL OF TEST POSTION?
-
ARE WRITTEN PROCEDURES FOR THE VISUAL INSPECTION OF FINIHED WELD AVAILABLE?
-
ARE WRITTEN PROCEDURES FOR DESTRUCTIVE TESTING OF WELD SPECIMENS AVAILBLE?
-
IS THE TEST IDENTIFICATION CODE (TEST # AND OR LETTERS) ON TEST SPECIMENS VERIFIED PRIOR TO TESTING?
-
ARE TEST RESULTS MARKED ON THE WELDER TEST FACILITY WORKSHEET AND WPQR?
-
ARE BEND OR OTHER SPECIMENS, STORED IN A SECURE AREA FOR A MINIMUM OF SIX MONTHS?
-
ARE WRITTEN PROCEDURES AVAILABLE FOR DESTROYING AND DISPOSAL OF SPECIMENS?
VI. OFF-SITE TESTING
-
WILL WELDERS BE TESTED OFF SITE?
-
WILL ACCEDITED TEST FACILITY TEST MATERIALS AND FILLER METALS BE USED?
-
ARE ALL REQUIREMENTS OF SECTION II,III, AND V OF THIS CHECKLIST MET FOR MATERIALS AND FILLER METALS USED?
-
IS AMPERAGE AND VOLTAGE VERIFIED USING THE FACILITIES CALIBRATED AMP/VOLT METER?
VII.REFERANCE DOCUMENTS
-
ARE CURRENT COPIES OF APPLICABLE WELDER QUALIFICATION CODES AVAILABLE TO WELDERS?
-
AWS D1.1 – STRUCTURAL WELDING CODE‐STEEL(2020)
-
YEAR
-
AWS D1.2 – STRUCTURAL WELDING CODE‐ALUMINUM (2014)
-
YEAR
-
AWS D1.3 – STRUCTURAL WELDING CODE SHEET STEEL(2018)
-
YEAR
-
AWS D1.4 – STRUCTURAL WELDING CODE REINFORCING STEEL (2018)
-
YEAR
-
AWS D1.5 – BRIDGE WELDING CODE(2020)
-
YEAR
-
AWS D1.6 – STRUCTURAL WELDING CODE STAINLESS STEEL (2017)
-
YEAR
-
AWS D1.8 – STRUCTURAL WELDING CODE‐SEISMIC SUPPLEMENT (2021)
-
YEAR
-
viii. AWS B2.1 – WELDING PROCEDURE AND PERFORMANCE QUALIFICATION STANDARD(2021)
-
YEAR
-
ASME SEC. IX – QUALIFICATION STANDARD FOR WELDING AND BRAZING PROCEDURES, WELDING AND BRAZING OPERATORS
-
YEAR
-
API 1104 – STANDARD FOR WELDING PIPELINES AND RELATED FACILITIES
-
YEAR
MECHANICAL TESTING
-
i. AWS B4.0 – STANDARD METHODS FOR MECHANICAL TESTING OF WELDS (2014)
-
YEAR
NON DESTRUCTIVE TESTING AND INSPECTION
-
ASNT TC 1A‐ RECOMMENDED PRACTICE No. SNT‐TC‐1A
-
YEAR
-
ASTM E165‐ LIQUID PENETRANT INSPECTION METHOD
-
YEAR
-
ASTM E709‐ MAGNETIC PARTICLE EXAMINATION
-
YEAR
-
ASTM E94‐ RADIOGRAPHIC TESTING
-
YEAR
-
ASTM E1032‐ RADIOGRAPHIC EXAMINATION OF WELDMENTS
-
YEAR
-
ASTM E164‐ ULTRASONIC CONTACT EXAMINATION OF WELDMENTS
-
YEAR
QUALIFICATION AND CERTIFICATION
-
AWS QC 1 – STANDARD FOR AWS CERTIFICATION OF WELDING INSPECTORS (2016)
-
YEAR
-
AWS B5.2 – SPECIFICATION FOR THE QUALIFICATION OF WELING INSPECTOR SPECIALIST AND WELDING INSPECTOR ASSISTANCES(2018)
-
YEAR
-
AWS QC 4 – STANDARD FOR ACCREDITATION OF TEST FACILITIES FOR AWS CERTIFIED WELDER PROGRAMS (1998)
-
YEAR
-
AWS QC 5 – AWS STANDARD FOR CERTIFICATION OF WELDING EDUCATORS (1991)
-
YEAR
-
AWS QC 7 – STANDARD FOR AWS CERTIFIED WELDERS(1993)
-
YEAR
-
AWS QC 7 – Supplement G – AWS PERFORMANCE QUALIFICATION TEST(1993)
-
YEAR
SAFETY AND HEALTH
-
ANSI Z49.1‐ SAFETY IN WELDING,CUTTING, AND ALLIED PROCESSES(2021)
-
YEAR
VIII. WELDING AND CUTTING EQUIPMENT
-
TOTAL NUMBER OF BOOTHS
-
NUMBER OF SMAW UNITS
-
NUMBER OF FCAW UNITS
-
NUMBER OF GMAW UNITS
-
NUMBER OF GTAW UNITS
-
NUMBER OF SAW UNITS
-
OTHER PROCESSES USED:
-
NUMBER OF OXY‐FUEL CUTTING/GOUGING STATIONS
-
TYPE OF FUEL GAS USED:
-
NUMBER OF CAC‐A UNITS
-
NUMBER OF PAC UNITS
-
TYPE OF MECHANICAL SAW
-
HOW ARE TEST SPECIMENS REMOVED FROM TEST COUPONS?
IX. TESTING EQUIPMENT
-
TYPE OF BEND TESTER UTILIZED
-
DOES THE BEND TESTER CONFORM TO SPECIFICATIONS IN THE APPROPRIATE CODE?
-
OTHER TESING EQUIPMENT USED
- YES
- NO
-
-
OTHER TESTING EQUIPMENT USED:
MEASURING TOOLS AVAILABLE:
-
MEASURING TAPE?
-
STEEL RULER?
-
MICROMETER?
-
DIAL CALIPER?
-
OPTICAL AID?
-
FILLET WELD GAUGE KIT?
-
WELD REINFORCEMENT GAUGE?
-
HI‐LOW GAUGE?
-
UNDERCUT GAUGE?
-
ARE MACRO ETCH TESTS PERFORMED ON SITE?
-
ARE WRITTEN PROCEDURES AVAILBLE?
X. WELDING AND CALIBRATION EQUIPMENT MAINTENANCE LOG AND RECORDS (i.e. WELDING MACHINES, METER, OVEN, BENDER)
-
IS A WRITTEN MAINTENANCE PROCEDURE ESTABLISHED?
-
IS MAINTENANCE LOG FOR EACH PIECE OF EQUIPMENT UP TO DATE?
-
IS EQUIPMENT IDENTIFIED?
-
ARE CALIBRATION METHODS DEFINED?
-
DOES EQUPMENT HAVE A CURRENT CALIBRATION TAG?
-
ARE OPERATING MANUALS AVAILABLE?
XI. GENERAL
-
DOES EQUIPMENT APPEAR WELL MAINTAINED?
-
IS LIGHTING IN THE WELDING AREA ADEQUATE?
-
DOES THE WELDING AREA APPEAR CLEAN?
-
ARE FIRE EXTINGUISHERS READILY AVAILABLE AND UP TO DATE?
-
IS A FIRST AID KIT READILY AVAILABLE?
ARE THERE ADEQUATE NUMBER OF:
-
WELDING HOODS?
-
WELDING SLEEVES OR JACKETS?
-
WELDING GLOVES?
-
CUTTING GOGGLES?
-
CHIPPING HAMMERS AND WIRE BRUSHES?
-
IS THE ROD OVEN TEMPERATURE MAINTAINED AS REQUIRED BY CODE?
-
ARE WRITTEN PROCEDURES ON FILE FOR RECORD RETENTION?
-
ARE ALL RECORDS RETAINED FOR A MINIMUM OF FIVE YEARS?
-
ARE RECORDS MAINTAINED IN A SECURE AREA?
-
IS THE FACILITY ACCREDITED WITH ANY OTHER ORGANIZATION?
-
WHAT ORGANIZATION?
-
IS THERE A WRITTEN TRAINING PLAN IN PLACE TO MAINTAIN AND IMPROVE STAFF SKILLS AND PROGRAM PERFORMANCE?
-
IS THE QA PROGRAM AUDITED ANNUALLY?
-
ARE COPIES OF THE AUDIT DOCUMENTS KEPT ON FILE?
-
WHO IS RESPONSIBLE FOR THE SELF AUDIT?
-
WHEN WAS THE LAST AUDIT PERFORMED?
-
AUDITORS
-
FACILITIES REPRESENTATIVE
Final Conclusion
-
Notes:
-
Recommendation of Auditor
Program Manager
-
Approved or Disapproved