Title Page
-
QPulse No.
-
Audit Title
-
Site
-
Conducted on
-
Prepared by
-
Personnel
management of iso 5001 kpi measures
-
Site involvement - are regular energy meetings held?
-
Are CoC endorser actions displayed?
-
Has an agreed annualised PUE Target been agreed?
Air flow management
-
Does the site have accurate records of IT racks in use
-
Percentage of racks in hot and cold aisle configuration
-
Percentage of racks in hot and cold aisle containment
-
Percentage of blanking panels in use within operational racks
-
Is there an effective check in place to check blanking panels are fitted?
cooling system efficiency
-
Chilled water temperatures: flow and return
-
Crac control methodology: percentage of cracs operating on supply air control
-
Average cold aisle temperature floor 1
-
Average cold aisle temperature floor 2
-
Average cold aisle temperature floor 3
-
Average crac supply air temperature floor 1
-
Average crac supply air temperature floor 2
-
Average crac supply air temperature floor 3
Electrical System Efficiency
-
UPS system efficiency