ISO Container Inspection Checklist

Undercarriage

Corner fittings

Bottom end rails

Bottom side rails

Door sill

Cross members

Forklift tunnels

Doors

ISO identification

CSC safety approval

Stencils

Corner posts

Corner fittings

Door header

Door sill

Door fittings

Door lining

Door gaskets

Rods

Rod retainers

Cams

Cam retainers

J-bars

Rain guttering

Placard holder

Left Side
Interior

Plywood lining

Kick rail

Vertical plate

Horizontal rail

Light leak

Exterior

ISO identification

Corner fittings

Corner posts

Top side rail

Bottom side rail

Forklift pockets

Panel

Placard holder

Front Wall
Interior

Plywood lining

Kick plate

Load bearing surfaces

Light leak

Exterior

ISO identification

Corner fittings

Corner posts

Top end rail

Bottom end rail

Panel

Placard holder

Right Side
Interior

Plywood lining

Kick rail

Vertical plate

Horizontal rail

Light leak

Exterior

ISO identification

Corner fittings

Corner posts

Top side rail

Bottom side rail

Forklift pockets

Panel

Placard holder

Floor

Flooring

Floor fasteners

Threshold plate

Tie-down devices

Light leaks

Roof

ISO identification

Corner fittings

Corner posts

Top end rail

Bottom end rail

Roof panel

Roof bows

Light leaks

Sign off

I have visually verified to the best of my ability the condition of the container as noted above and found that the container is structurally sound, weather tight, has no false compartments, contains no un-manifested material and the locking mechanisms are in good order.

Additional Recommendations

Name & Signature of Inspector