Title Page
-
Branch name
-
Branch number
-
Conducted on
-
Prepared by
-
Location
-
Can the survey go ahead?
-
State reason for abort
Site 'T-Shirt Size' Verification (Visual Walk Round)
-
User count - Ask the site manager to confirm how many people are usually based at this site
-
Device count - Count the number of Kiosks (PoS stations) and multiply that number by 4
-
Device count - Count the number of desks which have a screen and/or laptop docking station
-
Based on the responses above please select which site type you are at
- Small (up to 8 people / 20 devices)
- Medium (up to 20 people / 40 devices)
- Large (up to 60 people / 80 devices)
- Extra Large (60+ people / 80+ devices)
Site 'T-Shirt Size' Verification (Comms Cab)
-
How many ports on the switch or switches are active/in use?
-
Does this match the number you counted on your visual walk around?
-
What's the difference between number of devices counted vs ports in use/patched in
Comms Cab Survey (Cab 1)
-
Locate and document location of this comms cabinet (e.g. ground floor, back left office, wall mounted)
-
Locate, or verify that someone on site has keys to the rack and that they work (get the person to open the rack). If the keys are lost / unavailable / don’t work, note this on the report.
-
Take a wide photo showing the entire cab
-
Take photos of individual components within the cab
-
What site type is this?
- Small (up to 8 people / 20 devices)
- Medium (up to 20 people / 40 devices)
- Large (up to 60 people / 80 devices)
- Extra Large (60+ people / 80+ devices)
-
Is there enough empty space in the cab to install an additional switch?
-
Add photos to support answer
-
Is there any kit not in use that can be removed? If so list it
-
Add photos of any kit not in use
-
Is there enough empty space in the cab to install an additional switch (if there is more than one cab) or additional two switches (if this is the only cab)
-
Add photos to support answer
-
Is there any kit not in use that can be removed? If so list it
-
Add photos of any kit not in use
-
Is there enough empty space in the cab to install an additional switch (if there is more than one cab) or additional three switches (if this is the only cab)
-
Add photos to support answer
-
Add photos of empty spaces within the cab
-
Add photos to support answer
-
Is there any kit not in use that can be removed? If so list it
-
Add photos of any kit not in use
-
Measure the depth of the rack and verify there is at least 450mm between the front and back rails
-
Add photo to confirm
-
Add supporting photo
-
Would the required distance be achieved by adjusting the rails?
-
Is a replacement rack required?
-
Measure the depth of the rack and verify there is at least 600mm between the front and rear doors when closed
-
Add supporting photo
-
Would the required distance be achieved by adjusting the rails?
-
Is a replacement rack required?
-
Add photo to confirm
-
Are there enough power outlets free for you to fully power all equipment to be installed in this cab?
-
Add a photo
-
Add a photo
-
Would it be possible to free up sockets by disconnecting old equipment on go-live day?
-
Is there a power outlet within 3 metres of the cab that an extension could be run from on the day?
-
Describe the location of the nearest available outlet and whether you think a new power outlet is required
-
Add a photo of nearest outlet
-
Add a description of where the power outlet is in relation to the cab
-
Add photos of the overall condition of the cable patching
-
Is any of the cabling obscuring or obstructing available rack space?
-
Add photos of each instance
-
Is any of the cabling obstructing the doors or rack sides closing?
-
Add photos
-
Can you identify the location of any exisiting BT sockets?
-
Add photos of them to include any circuit identifiers or PSTN numbers
-
Is the cab free standing?
-
Identify a space on the rear rack behind the cabling panel for the ISP engineer to install their NTE and affix the sign that has been provided
-
Add a photo of sign
-
Identify a suitable location on the wall within 1m for the ISP engineer to install their NTW. Affix provided sign to wall
-
Add a photo of sign on wall
Comms Cab Survey (2nd/3rd cabs)
-
Is there a 2nd comms cab on site?
-
Move on to the next question
-
Locate and document location of this comms cabinet (e.g. ground floor, back left office, wall mounted)
-
Locate, or verify that someone on site has keys to the rack and that they work (get the person to open the rack). If the keys are lost / unavailable / don’t work, note this on the report.
-
Take a wide photo showing the entire cab
-
Take photos of individual components within the cab
-
What site type is this?
- Small (up to 8 people / 20 devices)
- Medium (up to 20 people / 40 devices)
- Large (up to 60 people / 80 devices)
- Extra Large (60+ people / 80+ devices)
-
Is there enough empty space in the cab to install an additional switch?
-
Add photos to support answer
-
Is there any kit not in use that can be removed? If so list it
-
Add photos of any kit not in use
-
Is there enough empty space in the cab to install an additional switch (if there is more than one cab) or additional two switches (if this is the only cab)
-
Add photos to support answer
-
Is there any kit not in use that can be removed? If so list it
-
Add photos of any kit not in use
-
Is there enough empty space in the cab to install an additional switch (if there is more than one cab) or additional three switches (if this is the only cab)
-
Add photos to support answer
-
Add photos of empty spaces within the cab
-
Add photos to support answer
-
Is there any kit not in use that can be removed? If so list it
-
Add photos of any kit not in use
-
Measure the depth of the rack and verify there is at least 450mm between the front and back rails
-
Add photo to confirm
-
Add supporting photo
-
Would the required distance be achieved by adjusting the rails?
-
Is a replacement rack required?
-
Measure the depth of the rack and verify there is at least 600mm between the front and rear doors when closed
-
Add supporting photo
-
Would the required distance be achieved by adjusting the rails?
-
Is a replacement rack required?
-
Add photo to confirm
-
Are there enough power outlets free for you to fully power all equipment to be installed in this cab?
-
Add a photo
-
Add a photo
-
Would it be possible to free up sockets by disconnecting old equipment on go-live day?
-
Is there a power outlet within 3 metres of the cab that an extension could be run from on the day?
-
Describe the location of the nearest available outlet and whether you think a new power outlet is required
-
Add a photo of nearest outlet
-
Add a description of where the power outlet is in relation to the cab
-
Add photos of the overall condition of the cable patching
-
Is any of the cabling obscuring or obstructing available rack space?
-
Add photos of each instance
-
Is any of the cabling obstructing the doors or rack sides closing?
-
Add photos
-
Can you identify the location of any exisiting BT sockets?
-
Add photos of them to include any circuit identifiers or PSTN numbers
-
Is the cab free standing?
-
Identify a space on the rear rack behind the cabling panel for the ISP engineer to install their NTE and affix the sign that has been provided
-
Add a photo of sign
-
Identify a suitable location on the wall within 1m for the ISP engineer to install their NTW. Affix provided sign to wall
-
Add a photo of sign on wall
-
Is there a 3rd comms cab on site?
-
Move on to the next page
-
Locate and document location of this comms cabinet (e.g. ground floor, back left office, wall mounted)
-
Locate, or verify that someone on site has keys to the rack and that they work (get the person to open the rack). If the keys are lost / unavailable / don’t work, note this on the report.
-
Take a wide photo showing the entire cab
-
Take photos of individual components within the cab
-
What site type is this?
- Small (up to 8 people / 20 devices)
- Medium (up to 20 people / 40 devices)
- Large (up to 60 people / 80 devices)
- Extra Large (60+ people / 80+ devices)
-
Is there enough empty space in the cab to install an additional switch?
-
Add photos to support answer
-
Is there any kit not in use that can be removed? If so list it
-
Add photos of any kit not in use
-
Is there enough empty space in the cab to install an additional switch (if there is more than one cab) or additional two switches (if this is the only cab)
-
Add photos to support answer
-
Is there any kit not in use that can be removed? If so list it
-
Add photos of any kit not in use
-
Is there enough empty space in the cab to install an additional switch (if there is more than one cab) or additional three switches (if this is the only cab)
-
Add photos to support answer
-
Add photos of empty spaces within the cab
-
Add photos to support answer
-
Is there any kit not in use that can be removed? If so list it
-
Add photos of any kit not in use
-
Measure the depth of the rack and verify there is at least 450mm between the front and back rails
-
Add photo to confirm
-
Add supporting photo
-
Would the required distance be achieved by adjusting the rails?
-
Is a replacement rack required?
-
Measure the depth of the rack and verify there is at least 600mm between the front and rear doors when closed
-
Add supporting photo
-
Would the required distance be achieved by adjusting the rails?
-
Is a replacement rack required?
-
Add photo to confirm
-
Are there enough power outlets free for you to fully power all equipment to be installed in this cab?
-
Add a photo
-
Add a photo
-
Would it be possible to free up sockets by disconnecting old equipment on go-live day?
-
Is there a power outlet within 3 metres of the cab that an extension could be run from on the day?
-
Describe the location of the nearest available outlet and whether you think a new power outlet is required
-
Add a photo of nearest outlet
-
Add a description of where the power outlet is in relation to the cab
-
Add photos of the overall condition of the cable patching
-
Is any of the cabling obscuring or obstructing available rack space?
-
Add photos of each instance
-
Is any of the cabling obstructing the doors or rack sides closing?
-
Add photos
-
Can you identify the location of any exisiting BT sockets?
-
Add photos of them to include any circuit identifiers or PSTN numbers
-
Is the cab free standing?
-
Identify a space on the rear rack behind the cabling panel for the ISP engineer to install their NTE and affix the sign that has been provided
-
Add a photo of sign
-
Identify a suitable location on the wall within 1m for the ISP engineer to install their NTW. Affix provided sign to wall
-
Add a photo of sign on wall
AP Survey Walkaround
-
Will the sales and customer area be covered by a single AP?
-
How many extra APs would be required in your opinion?
-
Add a photo of where you think the extra AP should go
-
Will the warehouse receive coverage from the indoor AP covering the sales area?
-
How many extra APs would be required in your opinion?
-
Add a photo of where you think the extra AP should go
-
Will the outdoor area receive coverage from the indoor AP covering the sales area?
-
How many extra APs would be required in your opinion?
-
Add a photo of where you think the extra AP should go
Sign Off
-
Site Manager Name
-
Site Manager Signature