Title Page
-
Site ITP conducted - (Project Name & Address)
-
SOLIDFC/ITP
-
Conducted on
-
Conducted by
-
Head Contractor
-
Project
INSPECTION REPORT
-
Work Description
-
Are you in the possession of most current drawing set
Pre-Pour Check List
-
Specify the Locations ( EX : Level 1 slab)
-
Finish RL' s are confirmed
-
Concrete Mix - ( Include mix design code )
-
Concrete Volume
-
Concrete tests are booked
-
Concrete Pump is Booked
Formwork
-
Surveyour confirmed soffit height, and setting out works
-
Setting out of Slab edge, rebate locations, penetrations, shower areas, set downs are completed
-
Checked formwork layout
-
Checked all props and frames are installed with adequate distance
-
Handrails and safe access are in place
-
Formed all service penetrations
-
Completed edge form
-
Formed all step downs, rebates, set down areas as per the current documentations
-
Installed all cast in items
-
Deck is clean and free of debris to start reinforcement works
-
Sealed all joints using appropriate method
-
Solid FC Surveyour confirmed as built of slab edge, set downs, penos, cast in plate locations, holding down bolt locations,
-
Formwork inspection done and approved to proceed
-
Attach Formwork inspection report
Reinforcement
-
Structural Drawing Reference
-
Correct Blinding/Formation level
-
Surface is clean and free of debris
-
Completed setting out works of Slab edge, step downs, rebate locations, starter bar locations, set downs for wet areas, Penetrations
-
Checked reinforcement Cover to concrete
-
Checked lap lengths
-
Checked Spacing
-
Installed all starter bars for columns and walls, stairs
-
Installed dowel bars, CJ reinforcement, Ferrules
-
Completed Bottom reinforcement
-
Completed Top Reinforcment
-
Installed all shear reinforcement
-
Engineer's inspection done and approved to pour
-
Attach Structural engineers inspection report and photos of reinforcement rectification works
By signing below you acknowledge that all set-out, excavation, reinforcement and formwork meet your requirements and authorise Solid FC to proceed with concreting.
-
Date and time
-
Solid FC signed
-
Principal Contractor Signed
Post - Pour
-
Attach location mark up
-
Attach last concrete Docket
-
Attach Concrete Pump Docket
-
Attach Photos of work progress
-
Attach Building surveyor's report if available