Title Page

  • Project Name

  • Project no.

  • Contractor / WT Team

  • ITR No.

  • Specific task checked

  • Location
  • Conducted on

  • Prepared by

Pre-checks

  • Using latest drawing/spec.?

  • Buried services identified/located?

  • Timber as specified? (Correct treatment, dimensions, species, finish,etc)

  • Fixings as specified?

  • Permit to dig obtained?

Mid-checks

  • Holes correctly dug? (Depth, straight vertical sides, drainage/gravel provided beneath post?)

  • Correct depth/volume of concrete installed?

  • Are all posts set vertical?

  • Concrete cured/set before backfilling?

  • No flat tops to timber to cause ponding/rot checked?

  • Does concrete slope away from timber? (so it doesn't trap/pond water around timber)

  • Posts supported during concrete curing?

Post-checks

  • Posts all vertical?

  • All fixings robust?

  • All rough edges/splinters/protruding nails/sharp edges removed?

  • Checked so no timber panels touch the ground?

  • Photo Report

  • If all items have passed inspection and are ready for handover, please sign below.

  • Inspector's signature

  • WT Site Manager/Overseer's signature

  • Contractor's signature (optional)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.