Information
-
Audit No.
-
Site ID and Audit Address
-
Details of CCTV installation.
-
Team Leader
-
Client
-
Conducted on
-
Audited by
General Requirements
GENERAL REQUIREMENTS
-
NOTE:- AUDITEE TO PROVIDE PHOTOGRAPHIC EVIDENCE OF DEFECT RECTIFICATION
-
1. GENERAL REQUIREMENTS
-
This audit checks for compliance with an IMS procedure?
-
1.1 IMS Procedure Number?
-
1.2 Did the audited task comply with the related procedure?
-
1.3 Has SIR or Rectification Notice been issued? Record number here?
-
2. Documentation Requirements?
-
2.1 Accurate "As Constructed" plan included in returned documentation?
-
2.2 ITS plans accurately marked up "As Constructed"
-
2.3 CCTV Commissioning Report completed
-
2.4 Dvtel Screen captures provided?
-
3. Electrical Compliance?
-
3.1 Earthstake location marked on plan
-
3.2 Were mains upgraded? Note size here.
-
3.3 Earth electrode is installed and complies with BSD 4035 and applicable version of AS/NZS:3000?
-
3.4 Main earthing conductor is 6mm2 and a Main Earth label is attached at electrode connection?
-
3.5 Detailed and signed Certificate of Test for CCTV electrical works affixed to door?
-
3.6 Cable terminations verified at controller and posts?<br>
-
3.7 Field wiring is loomed inside controller?
-
3.8 No bare copper exposed at any terminals - AS/NZS:3000?
-
3.9 Disused cables removed or terminated - AS/NZS:3000?
-
3.10 Controller conduits sealed as per BSD 4035?
-
Comments / Other?
Controller
CONTROLLER
-
Controller Type?
-
QTC
-
Eclipse
-
Tyco PSC3
-
Philips PSC Mk2
-
ATS ATSC4
-
4. Other controller items checked?
-
4.1 Tophat installed and communications control board connected to power?
-
4.2Top hat installed and connected as per drawing FSG20102-01 D
-
4.3 Additional circuit breakers installed an labelled?
-
4.4All ELV switchgear accurately labelled?
-
4.5 Neutral link numbers labelled?
-
5. CCTV Information
-
5.1 Comms Connection Type
- Optus ADSL
- BCC ADSL
- Optus 3G
- BCC Fibre
- Cat5 to MUX
-
5.2 Camera Type?
-
5.3 Camera Model
-
Comments / Other?
Hardware Installation
HARDWARE INSTALLATION
-
6. Posts / poles / footings checked?
-
6.1 Pole Type
- 4.1m Pedestal
- JUP
- M/A
- JU/MA
- Fold Down Pole
-
6.2 CCTV Bracket Type
- 1.5m Outreach
- 3m Pedestal Extension
- 3m Mastarm Extension
- Other
-
6.3 Post mountings and footings as per BSD Drawing?
-
6.4 CCTV Bracket installed as per BSD relevant drawing?
-
6.4 CCTV Breakout boxes as per FSG Drawing?
-
6.5 Redundant holes in posts, outreaches and enclosures plugged to AS/NZS:3000?
-
Comments / Other?
Civil
CIVIL
-
8. Pits and Conduits?
-
8.1 Pit lids compliant with BSD 1012 & 4034 and fitted correctly?
-
8.2 Pit lids show correct designation and BCC logo or lettering?
-
8.3 Pit lids not damaged or a trip hazard?
-
9. Posts, Poles?
-
9.1 Poles and foundations comply with relevant standard drawings?
-
9.2 Pole bases grouted as per BSD 4121 (JU) or BSD 4151 (post)?
-
9.3 Post setback as per BSD 4151?
-
9.4 JU pole setback as per Energex Public Lighting Construction Manual?
-
10. Footpath, Kerb, Roadway Checks?
-
10.1 Footpaths, roadway and kerbs reinstated?
-
10.2 Intersection left clean and tidy?
-
Comments / Other?