James McHugh Construction - Floor Turnover Release
-
Job Name & Number:
-
Floor(s) to be signed off:
-
Attending persons & company they represent:
-
Prepared by
-
Conducted on
Safety.
-
Are perimeter cables/handrails/toe boards acceptable?
-
Is perimeter debris netting in place and acceptable?
-
Are all hole covers secured, clearly marked and acceptable?
Finishing.
-
Have all in-fills, sight-holes and tie-holes been poured/patched?
-
Have all concrete chipping operations been completed?
-
Have all exposed surfaces been ground and patched?
Cleanup.
-
Have all framing materials been removed from the floor?
-
Has all debris been removed from the floor?
-
Has the floor been swept clean?
Work that will be completed after floor sign-off.
-
List any work that will be completed at a later date.
-
Add media
Acceptance.
-
Person releasing floor:
-
Person accepting floor: