Safety.

  • Are perimeter cables/handrails/toe boards acceptable?

  • Is perimeter debris netting in place and acceptable?

  • Are all hole covers secured, clearly marked and acceptable?

Finishing.

  • Have all in-fills, sight-holes and tie-holes been poured/patched?

  • Have all concrete chipping operations been completed?

  • Have all exposed surfaces been ground and patched?

Cleanup.

  • Have all framing materials been removed from the floor?

  • Has all debris been removed from the floor?

  • Has the floor been swept clean?

Work that will be completed after floor sign-off.

  • List any work that will be completed at a later date.

  • Add media

Acceptance.

  • Person releasing floor:

  • Person accepting floor:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. Any ratings or scores displayed in our Public Library have not been verified by SafetyCulture for accuracy. Users of our platform may provide a rating or score that is incorrect or misleading. You should independently determine whether the template is suitable for your circumstances. You can use our Public Library to search based on criteria such as industry and subject matter. Search results are based on their relevance to your search and other criteria. We may feature checklists based on subject matters we think may be of interest to our customers.