Information
-
Document No.
-
Location
-
Conducted on
-
Personnel
Closing Checklist
2 Hours Before Close
-
Check Lobby Trash, pull if more than 50% full. Clean lid and replace. Sweep all window sills. Windex front doors inside and out.
-
Ensure mixer is clean, sanitized, and all pieces are in place for morning production. Table is cleaned top and bottom…
-
Restock napkin and spoon dispensers on front counter
-
All dishes should be done. Sinks drained and refilled for closing
-
Prep area/tables cleaned, sanitized, and restocked for production. Clean top and bottom shelves & Polish
-
Complete 10 Trays of Rims/ 1 Tray of Mini Rims
-
Fresh1 Hour Before Close
-
Make Backups for Line Custards Needed.
-
Flip all custard pans in table, rotate and refill all product. Wipe doors inside and out, gaskets, clean bottom of cooler inside.
-
Pull all trash cans and replace bags. Use only one can for the remainder of the shift.
-
Rotate JARS cooler, pull trays with less than 2 jars. Place jars inside of build table cooler. Restock JARS cooler. Wipe down all racks, clean bottom of cooler, glass inside and out.
-
Pre-close SS station, drip tray, under faceplate, top of machine. Change lids on sauce bottles.
-
Sweep and mop Walk-in cooler, check under shelves for debris.
-
Spray off broom heads, Dust Pans ,clean mop sink
-
Breakdown shaker bubbler @ 9pm ONLY. Clean, sanitize, and replace all parts. DO NOT SCRUB.
-
Sweep and mop FOH, clean window sills, kiosk screens, Counters.
At Close
-
Breakdown SS station, put machine into standby mode. Flip intake tube. Place shell chocolate with lid on bottom shelf of prep cooler. Clean steam table, wipe ice cream machine, replace all pieces.
-
Complete all dishes. Drain and spray down all 3 sink compartments.
-
Restrooms clean and supplies stocked?
-
Empty all SANI buckets. Clean and hang towels to dry overnight.
-
Receiving clean? Pallets wrapped, trash crushed, extra carts taken up front, claims carts straightened up and condensed?
-
Turn off all Lights
-
Refill Fruit container, wrap individual cups with plastic wrap
-
Ice Cream Machine full, tubes flipped, in overnight mode
-
Managers office clean and organized?
-
Refill Cups and Lids