Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. Site appearance and layout- does the working environment look safe ?
-
Comments / Actions
2. Bin the broom - Have the team stopped using brooms and use vacuums / mechanical sweeper or dust suppression. Have dust making activities been identified and suitably controlled?
-
Comments / Actions
3. Are there safe clearly marked pedestrian walkways, free of trailing cables, hose, pipes, or other trip hazards?
-
Comments / Actions
4. Is housekeeping and storage of materials well managed and maintained to a high standard to prevent damage or injury?
-
Comments / Actions
5. Are the working at height risks being managed eg edge protection in place - access equipment in good order and appropriate for the task.
-
Comments / Actions
6. Select an activity - Check if operatives have had a morning briefing / start right.
-
Comments / Actions
7. Which quality / high risk activity has been discussed with operatives / supervisors on site? (Write in below). Do they understand their controls in place?
-
Comments / Actions
8. Does the workmanship look and feel right? If not discuss with operatives.
-
Comments / Actions
9. Are members of the public adequately protected? Consider safe access; the impact of construction traffic; mud on road; subcontractor parking?
-
Comments / Actions
10. Are the project team using training and consultation to build positive relationships?
-
Comments / Actions
11. Are the environmental or community targets set by the client or site team being met? How are these being implemented and recorded? Eg Waste, carbon. ( write below ).
-
Comments / Actions
12. Are there any significant environmental risks on this project? How are the team & supply chain managing these risks? (write in below ).
-
Comments / Actions
13. Further comments; Consider Near Miss Reporting; Management of major risks; CCS registration posters & information prominently displayed.
-
Comments / Actions
14. Does the site team need any support?
-
Comments / Actions
Have all operative received a "Start Right" induction briefing? Print and sign below all operative that have received an induction briefing.
-
Follow Start Right note.
"Good morning"
Think about
Info from start right meeting
Before starting work STOP, THINK, and CHECK!
What has changed since yesterday?
Check and challenge. -
-
Complete your 5 point checklist before leaving site.
-
1. Is your area of site safe and secure, to prevent injury if anybody enters?
-
2. Are members of the public safe from the days activities?
-
3. Is your plant and equipment safe and secure?
-
4. Are your materials and waste stored appropriately to prevent injury and damage?<br> Consider wind, rain and safe access.<br>
-
5. Are areas where anybody could fall suitably protected?
-
I have read and fully understand the Risk Assessments an Method Statement relating to this job.
-
Add signature
-
Add signature
-
Add signature
-
Add signature
-
Add signature
15. Overall site rating.
-
Green - Good site with zero or minor comments<br>Amber - Phoned senior manager to follow up within 48 hrs.<br>Red - Significant concern with standards. Stopped operations and phoned one of the leaders.
Sign Off
-
On site representative
-
Auditor's signature