Title Page
-
Site/Facility Name:
-
Service completed by:
-
Audit completed by:
-
Conducted on:
-
Location
Site Information
-
What service was completed?
-
Did all employs sign in and out of site?
-
Why was this not done/required?
-
Is there a mobile report or paperwork available and have all sections been correctly completed for the work that was carried out on site?
-
Are pre and post photos, temp readings, air speeds, ATP results and ph testing results adequate?
-
Have coils been adequately washed and cleared from contamination?
-
Have fans been adequately cleaned and cleared from contamination?
-
Has drip tray been cleaned?
-
Have side panels been removed and cleaned?
-
Are light fittings clean and free from contamination?
-
Are coving and cornice's clean and free from contamination?
-
Are all switches, conduit, fittings etc clean and free from contamination?
-
Are all door hinges, handles, frames and seals clean and free from contamination?
-
Has D-Mould been applied correctly to all surfaces?
-
Has D-Mould been applied correctly to all door seals?
-
Have floors been left in a clean state?
-
Has an appropriate service sticker been applied neatly and correctly to the equipment?
-
Is the overall quality of the job up to standard with the full scope of works?
-
Schedule a re-clean by technician <1 week from audit date